Ref. |
CODE |
Source Page |
CODE MEANING |
Signature Date |
601 |
BAGR |
1 |
Bridge Approach Guardrail |
9/1/99 |
601 |
BAGR |
1 |
Bridge Approach Guardrail |
9/1/98 |
601 |
BAGR |
1 |
Bridge Approach Guardrail |
9/1/97 |
601 | BAGR | 2 | Bridge Approach Guardrail | 03/01/05 |
601 | BAGR | 2 |
Bridge Approach Guardrail |
9/1/98 |
601 |
BAGR |
2 |
Bridge Approach Guardrail |
5/1/97 |
601 |
CWGS |
1 |
Curved W-Beam Guardrail System |
5/1/97 |
601 |
CWGS |
02 |
Curbed W-Beam Guardrail System |
09/02/08 |
601 |
CWGS |
2 |
Curved W-Beam Guardrail System |
5/1/97 |
601 |
CWGS |
04 |
Curved W-Beam Guardrail System |
09/02/08 |
601 |
CWGT |
1 |
Curved W-Beam Guardrail Terminal |
4/1/96 |
601 |
CWGT |
2 |
Curved W-Beam Guardrail Terminal |
11/1/95 |
601 |
EATB |
1 |
Energy Absorbing Terminal B |
9/1/98 |
601 |
EATB |
1E |
Energy Absorbing Terminal B |
9/1/98 |
601 |
EATB |
5 |
Energy Absorbing Terminal B |
9/1/98 |
601 |
GRET |
6 |
Guardrail End Treatment |
1/2/98 |
601 |
GRET |
7 |
Guardrail End Treatment |
1/2/97 |
601 |
GRET |
8 |
Guardrail End Treatment |
9/1/97 |
601 | MPPG | 1 | Median Pier Protection Guardrail | 11/15/99 |
601 | MPPG | 2 | Median Pier Protection Guardrail | 09/01/97 |
601 | MPPG | 3 | Median Pier Protection Guardrail |
03/01/05 |
601 | MPPG | 4 | Median Pier Protection Guardrail | 03/01/05 |
601 |
MPPG |
4 |
Median Pier Protection Guardrail |
8/1/96 |
601 |
MTGR |
01 |
Thrie Beam Guardrail |
03/01/05 |
601 |
NWGA |
04 |
Nested W-Beam Guardrail Assembly |
09/04/01 |
601 |
RPPG |
1 | Roadside Pier Protection Guardrail |
04/03/95 |
601 | RPPG | 2 | Roadside Pier Protection Guardrail |
09/01/97 |
601 | RPPG | 3 | Roadside Pier Protection Guardrail |
09/01/97 |
601 | RPPG | 4 | Roadside Pier Protection Guardrail |
04/03/95 |
601 | RPPG |
5 | Roadside Pier Protection Guardrail | 05/03/99 |
601 |
RPPG |
5 |
Roadside Pier Protection Guardrail |
4/3/95 |
601 | RPPG |
6 |
Roadside Pier Protection Guardrail |
09/01/97 |
601 |
TBGC |
01 |
Thrie-Beam Guardrail Components |
03/03/03 |
601 |
TMTT |
01 |
Double Faced Thrie Beam GR Transition |
03/01/05 |
601 |
TPGP |
1 |
Transition At Pier Type GP |
4/3/95 |
601 |
TTGB |
01 |
Guardrail Transition Type TGB |
03/03/03 |
601 |
TTGB |
1 |
Guardrail Transition Type TGB |
9/1/98 |
601 |
TTGB |
03 |
Guardrail Transition Type TGB |
03/01/04 |
601 |
TTGB |
04 |
Guardrail Transition Type TGB |
03/01/04 |
601 |
TTGB |
05 |
Guardrail Transition Type TGB |
03/02/04 |
601 |
TTGP |
01 |
Guardrail Transition Type GP |
04/03/95 |
601 |
TTGP |
02 |
Guardrail Transition Type GP |
04/01/96 |
601 |
TTGT |
01 |
Transition Thrie Guardrail Top |
09/02/03 |
601 |
TTGT |
02 |
Transition Thrie Guardrail Top |
05/01/00 |
601 |
TTMS |
01 |
Double Faced Thrie Beam GR Transition |
03/01/05 |
601 |
TTVH |
01 |
Guardrail Transition Type VH |
04/03/95 |
601 |
TTVH |
02 |
Guardrail Transition Type VH |
04/03/95 |
601 |
TWGB |
03 |
Guardrail Transition Type WGB |
04/03/95 |
601 |
TWGT |
01 |
W-Beam GR to Thrie Beam Transition |
03/01/05 |
601 |
WBGA |
01 |
W-Beam Guardrail Assemblies |
03/01/04 |
601 |
WBGA |
1 |
W-Beam Guardrail Assemblies |
5/1/98 |
601 |
WBGA |
1 |
W-Beam Guardrail Assemblies |
1/2/96 |
601 |
WBGA |
1 |
W-Beam Guardrail Assemblies |
9/1/98 |
601 |
WBGA |
02 |
W-Beam Guardrail Assemblies |
09/03/02 |
601 |
WBGA |
2 |
W-Beam Guardrail Assemblies |
9/1/98 |
601 |
WBGA |
2 |
W-Beam Guardrail Assemblies |
1/2/96 |
601 |
WBGA |
3 |
W-Beam Guardrail Assemblies |
4/3/95 |
601 |
WBGA |
3 |
W-Beam Guardrail Assemblies |
9/1/98 |
601 |
WBGA |
4 |
W-Beam Guardrail Assemblies |
9/1/98 |
601 |
WBGA |
06 |
W-Beam Guardrail Assemblies |
09/01/00 |
601 |
WBGC |
3 |
W-Beam Guardrail Components |
1/2/96 |
602 |
CCMB |
3 |
Concrete Median Barrier |
6/3/96 |
602 |
CCMB |
4 |
Concrete Median Barrier |
4/3/95 |
602 |
TCCB |
1 |
Traffic Control Median Barrier |
9/1/97 |
602 |
TCCB |
2 |
Traffic Control Median Barrier |
1/2/98 |
602 |
TCCB |
3 |
Traffic Control Median Barrier |
9/1/97 |
602 |
TCCB |
4 |
Traffic Control Median Barrier |
9/1/97 |
603 |
CLTF |
1 |
Chain Link Type Fence |
4/3/95 |
605 |
CCCG |
01 |
Combined Concrete Curb & Gutter |
09/01/99 |
605 |
CCCG |
1 |
Combined Concrete Curb & Gutter |
9/1/97 |
605 |
CCIN |
1 |
Concrete Curb Integral |
9/1/97 |
605 |
GTRC |
3 |
Gutter Turnout Reinforced |
9/1/97 |
610 |
DRIV |
4 |
Drives |
1/2/97 |
610 |
DRIV |
5 |
Drives |
1/2/97 |
610 |
DRIV |
9 |
Drives |
1/2/97 |
610 |
DRIV |
10 |
Drives |
1/2/97 |
610 |
DRIV |
12 |
Drives |
1/2/97 |
610 |
DRIV |
15 |
Drives |
6/3/96 |
610 |
DRIV |
17 |
Drives |
1/2/97 |
610 |
DRIV |
19 |
Drives |
1/2/97 |
610 |
MBAP |
01 |
Mailbox Approach Plan Views |
09/01/10 |
610 |
PRAP |
2 |
Public Road Approach |
9/1/97 |
610 |
PRAP |
2 |
Public Road Approach |
9/1/98 |
610 |
PRAP |
3 |
Public Road Approach |
9/1/97 |
610 |
PRAP |
3 |
Public Road Approach |
9/1/98 |
610 |
PRAP |
4 |
Public Road Approach |
9/1/95 |
610 |
PRAP |
5 |
Public Road Approach |
1/2/98 |
610 |
PRAP |
6 |
Public Road Approach |
9/1/97 |
610 |
PRAP |
6 |
Public Road Approach |
9/1/98 |
610 |
PRAP |
7 |
Public Road Approach |
9/1/97 |
610 |
PRAP |
8 |
Public Road Approach |
1/2/98 |
610 |
PRAP |
9 |
Public Road Approach |
4/3/95 |
610 |
PRAP |
10 |
Public Road Approach |
11/1/95 |
610 |
PRAP |
10 |
Public Road Approach |
9/1/98 |
610 |
PRAP |
11 |
Public Road Approach |
1/2/98 |
610 |
PRAP |
11 |
Public Road Approach |
9/1/98 |
610 |
PRAP |
12 |
Public Road Approach |
11/1/95 |
610 |
PRAP |
13 |
Public Road Approach |
4/3/95 |
610 |
PRAP |
13 |
Public Road Approach |
5/1/98 |
610 |
PRAP |
14 |
Public Road Approach |
9/1/97 |
610 |
PRCO |
1 |
Public Road Crossover |
4/3/95 |
610 |
PRCO |
3 |
Public Road Crossover |
1/2/98 |
610 |
PRCO |
7 |
Public Road Crossover |
9/1/97 |
610 |
RCBA |
1 |
Reinforced Concrete Bridge Approach |
9/1/97 |
610 |
RCBA |
1 |
Reinforced Concrete Bridge Approach |
9/1/98 |
610 |
RCBA |
3 |
Reinforced Concrete Bridge Approach |
1/2/98 |
610 |
RCBA |
4 |
Reinforced Concrete Bridge Approach |
9/1/97 |
610 |
RCBA |
5 |
Reinforced Concrete Bridge Approach |
9/1/97 |
610 |
RCBA |
6 |
Reinforced Concrete Bridge Approach |
9/1/97 |
610 |
RCBA |
7 |
Reinforced Concrete Bridge Approach |
9/1/97 |
611 |
MBAS |
2 |
Mailbox Assembly |
4/3/96 |
611 |
TCCO |
1 |
Traffic Control Crossovers |
4/3/95 |
611 |
TCCO |
2 |
Traffic Control Crossovers |
4/1/96 |
611 |
TCCO |
2 |
Traffic Control Crossovers |
1/4/99 |
611 |
TCCO |
3 |
Traffic Control Crossovers |
4/1/96 |
611 |
TCCO |
3 |
Traffic Control Crossovers |
1/4/99 |
611 |
TCCO |
4 |
Traffic Control Crossovers |
4/1/96 |
616 |
SWCO |
01 |
Slopewall Concrete |
09/02/03 |
616 |
SWCO |
02 |
Slopewall Concrete |
09/02/03 |
616 |
SWCO |
03 |
Slopewall Concrete |
09/02/03 |
616 |
SWCO |
04 |
Slopewall Concrete |
09/02/03 |
616 |
SWCO |
05 |
Slopewall Concrete |
01/03/00 |
616 |
SWCO |
5 |
Slopewall Concrete |
4/3/95 |
616 |
SWCO |
06 |
Slopewall Concrete |
09/02/03 |
616 |
SWCO |
6 |
Slopewall Concrete |
4/3/95 |
616 |
SWCO |
07 |
Slopewall Concrete |
09/01/10 |
616 |
SWRR |
01 |
Slopewall & Riprap Details |
09/02/03 |
616 |
SWRR |
02 |
Slopewall & Riprap Details |
09/02/03 |