Language Translation
  Close Menu
INDOT Archived Standard Drawings–Section 700

Doing Business with INDOT — Standards and Specifications

Standard Drawings

Section 700
Structures

ARCHIVED DRAWINGS

Ref.
CODE
Source
Page
CODE MEANING
Signature
Date
701 BPIL
2
Bridge Pilings
1/2/98
701 BPIL
04
Bridge Pilings
09/01/10
701 BPIL
05
Bridge Pilings
05/01/98
701 BPIL
5
Bridge Pilings
9/30/94
701 BPIL
06
Bridge Pilings
09/01/10
704 BDCG
1
Bridge Drain Castings & Grates
4/3/95
704 BDCG
03
Bridge Drain Castings & Grates
09/30/94
704 BDCG
04
Bridge Drain Castings & Grates
09/30/94
704BDCG
5
Bridge Drain Castings & Grates
06/03/96
706 BCBR
1
Bridge Concrete Barrier Rail
9/1/97
706 BCBR
1
Bridge Concrete Barrier Rail
9/1/98
706 BCBR
2
Bridge Concrete Barrier Rail
9/1/97
706 BCBR
2
Bridge Concrete Barrier Rail
9/1/98
706 BCBR
3
Bridge Concrete Barrier Rail
9/1/97
706 BCBR
4
Bridge Concrete Barrier Rail
9/1/97
706 BCBR
4
Bridge Concrete Barrier Rail
9/1/98
706 BRPP
01
Bridge Railing Parapet Pedestrian
09/01/05
706 BRPP
02
Bridge Railing Parapet Pedestrian
09/04/07
706 BRTM
01
Bridge Railing Top Mount
09/03/02
706 CBRT
01
Concrete Bridge Railing Transition
05/01/00
706 CBRT
1
Concrete Bridge Railing Transition
9/1/98
706 CBRT
02
Concrete Bridge Railing Transition
09/01/09
706 CBRT
03
Concrete Bridge Railing Transition
05/01/00
706 TASE
02
Transition Approach Slab Extension
09/01/06
706 TBRC
01
Retrofit Thrie Beam Bridge Railing
09/01/06
706 TBRC
02
Retrofit Thrie Beam Bridge Railing
03/01/05
706 TBRF
01
Retrofit Thrie Beam Bridge Railing
03/01/05
706 TTBC
01
Transition Thrie Beam Common
03/01/04
706 TTBC
02
Transition Thrie Beam Common
09/01/06
706 TTBC
03
Transition Thrie Beam Common
03/03/03
706 TTBP
01
Concrete Bridge Railing Transition, TPF-1
09/01/09
706 TTBP
03
Concrete Bridge Railing Transition, TPF-2
09/01/09
706 TTBP
05
Concrete Bridge Railing Transition, TPS-1
09/01/09
706 TTBP
07
Concrete Bridge Railing Transition, TPS-2
09/01/09
706 TTBT
01
Transition Thrie Beam Truck
09/01/06
706 TTBT
1
Transition Thrie Beam Truck
9/1/98
706 TTBT
03
Transition Thrie Beam Truck
09/01/06
706 TTBT
2
Transition Thrie Beam Truck
9/1/98
706 TTTX
01
Conc. Bridge Railing Transition Type TTX
09/01/09
706 TWBC
01
Transition W-Beam Common
03/03/03
707 BPBF
01
Bridge Precast Beam Fabrication
09/01/04
707 BPBF
02
Bridge Precast Beam Fabrication
05/01/00
707 BPBF
03
Bridge Precast Beam Fabrication
09/01/09
711 BSTS
1
Bridge Steel Shoes
5/1/97
711 BSTS
3
Bridge Steel Shoes
8/1/96
711 BSTS
4
Bridge Steel Shoes
8/1/96
713 TCTR
01
Traffic Control Temporary Runaround
09/01/06
713 TCTR
02
Traffic Control Temporary Runaround
09/01/06
713 TCTR
02A
Traffic Control Temporary Runaround
09/01/06
713 TCTR
03
Traffic Control Temporary Runaround
09/01/07
713 TCTR
4
Traffic Control Temporary Runaround
9/1/97
714 BCJT
01
Box Culvert Joint
05/03/99
714 BCSP
02
Box Culvert Sumping Protection
09/01/10
715 PCES
1
Precast Concrete End Section
1/2/98
715 PHCL
19
Pipe Height of Cover Limits
1/2/98
715 PIPE
02
Pipe
09/01/10
720 EDCA
1
Earth Ditch Casting
4/3/95
720 ICCA
3
Inlet/Catch Basin Casting
4/3/95
720 ICCA
4
Inlet/Catch Basin Casting
4/3/95
720 ICCA
5
Inlet/Catch Basin Casting
4/3/95
720 ICCA
6
Inlet/Catch Basin Casting
4/3/95
720 ICCA
8
Inlet/Catch Basin Casting
4/3/95
720 ICCA
9
Inlet/Catch Basin Casting
4/3/95
720 ICCA
10
Inlet/Catch Basin Casting
4/3/95
720 ICCA
11
Inlet/Catch Basin Casting
4/3/95
720 ICCA
12
Inlet/Catch Basin Casting
4/3/95
720 ICCA
13
Inlet/Catch Basin Casting
4/3/95
720 ICCA
15
Inlet/Catch Basin Casting
4/3/95
720 ICCA
16
Inlet/Catch Basin Casting
4/3/95
720 ICCA
18
Inlet/Catch Basin Casting
4/3/95
720 ICCA
19
Inlet/Catch Basin Casting
4/3/95
720 ICCA
20
Inlet/Catch Basin Casting
4/3/95
720 ICCA
21
Inlet/Catch Basin Casting
4/3/95
720 INCA
1
Inlet Casting
4/3/95
720 INCA
2
Inlet Casting
4/3/95
720 INST
8
Inlet Structure
9/1/97
720 INST
9
Inlet Structure
9/1/97
720 MHCA
1
Manhole Casting
4/3/95
720 MHCA
2
Manhole Casting
1/2/96
720 MHCA
3
Manhole Casting
4/3/95
720 MHST
1
Manhole Structures
4/3/95
720 SDCP
1
Slotted Drain Cleanout Port
5/1/98
720 SDCP
2
Slotted Drain Cleanout Port
5/1/98
720 SDCP
3
Slotted Drain Cleanout Port
5/1/98
724 BJTS
1
Bridge Joints
1/3/95
 
[an error occurred while processing this directive]

INDOT Events

More News & Events

Top FAQs