Standard Drawings, Sept 2008, English Drawings

Article

Standard Drawings, Sept 2008, English Drawings

Standard Drawings, Sept 2008, English Drawings


Effective for Lettings on or after September 1, 2008
 
English Standard Drawings

Last Updated: 3/4/19

Ref.
Title Description
Date
E 401-REBS-01 Ramp Entrance Terminal HMA Shoulder Ramp Entrance with Bituminous Shoulder
9/2/08
E 501-RECS-01 Ramp Entrance Terminal Concrete Shoulder Ramp Entrance Concrete Shoulder
9/2/08
E 501-RECS-02 Ramp Exit Terminal Concrete Shoulder Ramp Exit Concrete Shoulder
9/2/08
E 503-CCPJ-08 Longitudinal Construction Joint PCCP Joints
9/2/08
E 601-CWGS-02 Curved W-Beam Guardrail System Curved W-Beam Guardrail System
9/2/08
E 601-CWGS-04 Curved W-Beam Guardrail System Curved W-Beam Guardrail System
9/2/08
E 601-NWGA-01 Nested Guardrail for Large Drainage Structures Nested W-Beam Guardrail Assembly
9/2/08
E 605-CCSJ-01 Concrete & Bituminous Curbs Sawed Joints Concrete Curbs Sawed Joints
9/2/08
E 610-DRIV-08 Class I & III Drive Grade Profiles Drives
9/2/08
E 706-TTBP-05 Concrete Bridge Railing Transition – Type TPS-1 Transition Type Bridge Parapet
9/2/08
E 707-BEBP-01 Elastomeric Bearing Pads – Type 1 & 2 Bridge Elastomeric Bearing Pads
9/2/08
E 707-BEBP-02 Elastomeric Bearing Pads – Type 3 & 4 Bridge Elastomeric Bearing Pads
9/2/08
E 707-BEBP-03 Elastomeric Bearing Pads – Type 5, 6 & 7 Bridge Elastomeric Bearing Pads
9/2/08
E 707-BPBF-03 Prestressed Beam Fabrication Tolerances Bridge Precast Beam Fabrication
9/2/08
E 715-BKFL-01 Method 1, New Roadway, Trench Pipe Backfill
9/2/08
E 715-BKFL-02 Method 1, New Roadway, Embankment Pipe Backfill
9/2/08
E 715-BKFL-03 Method 1, Existing Asphalt Roadway, Trench Pipe Backfill
9/2/08
E 715-BKFL-04 Method 1, Existing PCCP Roadway, Trench Pipe Backfill
9/2/08
E 715-BKFL-05 Method 1, Existing Composite Roadway, Trench Pipe Backfill
9/2/08
E 715-BKFL-06 Method 2, New or Existing Drive, Trench Pipe Backfill
9/2/08
E 715-BKFL-07 Method 2, New or Existing Drive, Embankment Pipe Backfill
9/2/08
E 715-BKFL-08 Method 3, Median Installation, Trench Pipe Backfill
9/2/08
E 715-BKFL-09 Method 1, Median Installation, Embankment Pipe Backfill
9/2/08
E 715-PASD-01 Pipe Anchor Strap Details Pipe Anchor Strap Details
9/2/08
E 720-CBST-01 Catch Basin – Type A Catch Basin Structure
9/2/08
E 720-CBST-04 Catch Basin – Type J Catch Basin Structure
9/2/08
E 720-INST-01 Inlet – Type A Inlet Structure
9/2/08
E 720-INST-02 Inlet – Type B & C Inlet Structure
9/2/08
E 720-INST-05A Inlet – Type H Inlet Structure
9/2/08
E 720-INST-06 Inlet – Type J Inlet Structure
9/2/08
E 720-INST-07 Inlet – Type M & R Inlet Structure
9/2/08
E 801-TCDV-03 Merging or Shifting Taper Traffic Control Devices
9/2/08
E 802-SNGP-06 Sign Data Tables Sign Placement
9/2/08

Contact Information

Elizabeth Phillips
Design Resources Engineer
(317) 232-6775