Doing Business with INDOT - Standards and Specifications
Standard Drawings |
English Metric |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 | Section 700 | Section 800 |
Effective for Lettings on or after March 1, 2006
English Standard Drawings
Section 400 - Asphalt Pavement
Section 500 - Rigid Pavement
Spec |
Code |
Page |
Code Meaning |
Drawing Title |
Date |
E400 |
PTRN |
01 |
Pavement Type Transition |
9/1/99 |
|
E401 |
REBS |
01 |
Ramp Entrance Terminal HMA Shoulder |
9/1/99 |
|
E401 |
REBS |
02 |
Ramp Exit Terminal HMA Shoulder |
1/4/99 |
|
E401 |
REBS |
03 |
Ramp Cross Sections HMA Shoulder |
9/1/00 |
|
E401 |
REBS |
04 |
Ramp Terminal Tables |
6/3/96 |
|
E402 |
SHCG |
01 |
(Now Unassigned) |
||
E402 |
SHCG |
02 |
(Now Unassigned) |
||
E402 |
TMPT |
01 |
|
|
|
E500 |
PTRN |
01 |
Pavement Type Transition |
9/1/99 |
|
E500 |
PTRN |
02 |
Pavement Type Transition |
1/3/00 |
|
E500 |
PTRN |
03 |
Pavement Type Transition |
9/1/99 |
|
E500 |
PTRN |
04 |
Pavement Type Transition |
9/1/99 |
|
E500 |
SHCG |
01 |
(Now Unassigned) |
||
E500 |
SHCG |
02 |
(Now Unassigned) |
||
E501 |
CCPJ |
01 |
(Now Unassigned) |
||
E501 |
CCPJ |
02 |
(Now Unassined) |
||
E501 |
CCPJ |
03 |
(Now Unassigned) |
||
E501 |
CCPJ |
04 |
(Noww Unassigned) |
||
E501 |
CCPJ |
05 |
(Now Unassigned) |
||
E501 |
CCPJ |
06 |
(Now Unassigned) |
||
E501 |
CCPJ |
07 |
(Now Unassigned) |
||
E501 |
CCPJ |
08 |
(Now Unassigned) |
||
E501 |
CCPJ |
09 |
(Now Unassigned) |
||
E501 |
CCPJ |
10 |
(Now Unassigned) |
||
E501 |
CCPJ |
11 |
(Now Unassigned) |
||
E501 |
RECS |
01 |
Ramp Entrance Terminal Concrete Shoulder |
9/1/00 |
|
E501 |
RECS |
02 |
Ramp Exit Terminal Concrete Shoulder |
9/1/99 |
|
E501 |
RECS |
03 |
Ramp Cross Sections Concrete Shoulders |
1/4/99 |
|
E501 |
SHCG |
01 |
(Now Unassigned) |
||
E501 |
SHCG |
02 |
(Now Unassigned) |
||
E503 |
CCPJ |
01 |
Type D-1 Contraction Joint |
3/1/05 |
|
E503 |
CCPJ |
02 |
Longitudinal Joint |
9/1/99 |
|
E503 |
CCPJ |
03 |
Longitudinal Joint |
3/1/04 |
|
E503 |
CCPJ |
04 |
Longitudinal Keyway Joint |
9/1/99 |
|
E503 |
CCPJ |
05 |
Transverse Construction Joint |
9/1/99 |
|
E503 |
CCPJ |
06 |
Transverse Joint Seals |
3/1/05 |
|
E503 |
CCPJ |
07 |
Longitudinal Construction Joint |
9/1/99 |
|
E503 |
CCPJ |
08 |
Longitudinal Construction Joint |
9/1/99 |
|
E506 |
CCPP |
01 |
Concrete Pavement Patch Details |
3/1/06 |
|
E507 |
RLTC |
01 |
Retrofit Dowel Slot & Slot Details |
9/1/04 |
|
E507 |
RLTC |
02 |
Retrofit Dowel Slot & Bar Location |
9/1/04 |