INDOT strives to develop, inspect, and test materials used to construct and maintain highways, thereby ensuring the most efficient and effective products are used on Indiana transportation construction projects.
Qualified Products and Sources
- Qualified Products Lists & Qualified Sources Lists
A listing of qualified products and sources that meet INDOT specifications for immediate use on INDOT Contracts. - Ready Mixed Concrete Plants
Publications & Manuals
- Indiana Test Methods Index
Test Methods and Procedures developed by INDOT for use with INDOT Specifications. - Frequency of Sampling and Testing Manual
This is the manual that outlines the Sampling and Testing requirements of materials for acceptance purposes on INDOT contracts.- Highlighted Changes to the Frequency of Sampling and Testing Manual
There were many revisions in the 2023 manual. They are highlighted in this document for comparison.
- Highlighted Changes to the Frequency of Sampling and Testing Manual
- Directive Index
Internal procedures developed by INDOT to direct testing activities. - Material Certification Guide
Directive 109 - Materials Classification for BABA (Build America, Buy America) rev. 4-1-2024
- 2023 Aggregate Specification Chart
- 2024 Management Representative Letter
- DMF Entry Reference Manual
Procedures for enrolling, accessing, and navigating the DMF Entry application. - Mobile Mixer Calibration - Ver 2.0- 2019
- Concrete Mix Design Spreadsheet - V14l.10.15.24
- Mix Design for LMC
- Life of an HMA Sample Webinar
Learn about INDOT's tools and processes behind gathering, testing, and grading HMA Samples. (Click Here for PDF)
Testing Memorandums
Certified Technicians/Supervisor Lists
Aggregate Bulk Specific Gravity
- 2024 Gsb List (3/28/24)
- Gsb List Changelog (3/28/24)
- HMA Gsb List Instructions
Data Views
PG Binder Index Adjustment
- Spreadsheet for PG Binder Index Adjustment
- Instructions for PG Binder Index Adjustment
- Example Spreadsheet
- Monthly PG Binder Index
- PG Binder Index FAQ
Certifications
This is a list of Certifications that includes the specifications and test result requirements for acceptance of materials.
Quality Assurance Manuals
- Certified Aggregate Technician Manual
Manual outlining the procedures to be followed by the Certified Aggregate Technicians. - Indiana Certified Asphalt Technician (ICAT) Manual
Manual outlining the procedures to be followed by the ICAT Technician. - Certified Hot Mix Asphalt Field Supervisor Policy
The policy to be followed to obtain and maintain a Certified HMA Field Supervisor certification.
Geotechnical Engineering Division Links
- Geotechnical Engineering Division Home Page
Manuals, Guidelines, Forms, and Approved List of Suppliers and Geotechnical Consultants. - Qualified Geotechnical Consultants
- Field Testing of Soils and Aggregate
Procedures to be followed for Acceptance Testing of Soils, Granular Soils and Aggregates.
IRI (International Roughness Index) Links and QA Information
- IRI Information (Links to Construction Information)
Forms, Guides and Worksheets - IRI Quality Assurance Procedures
Information on INDOT's QA Program
Contact Information
Matthew Beeson
Division of Materials and Tests
Indiana Department of Transportation
120 S. Shortridge Road
Indianapolis, IN 46219
(317) 522-9662
MBeeson@indot.in.gov