| | |
| General Materials Management Administration |
| Sample Submittal to the Division of Materials and Tests | |
| Expediting Testing of Samples | |
| District Laboratory Inspections | |
| District Sample Proficiency Program | |
| Qualified Laboratory Program | |
| Independent Assurance and Qualified Acceptance Personnel Program | |
| ITM Rules of Preparation | |
109 | Material Certification Procedure for Contracts Utilizing SiteManager | 4/22/21 |
110 | New Products | 3/23/16 |
111 | Indiana Test Methods or Procedures | 8/1/14 |
112 | Failed Materials | 2/6/24 |
200 | Aggregate Materials |
201 | Certified Aggregate Producer Program Procedures | 2/1/19 |
202 | Aggregate Quality and Verification Samples | 4/1/24 |
203 | Dolomite Aggregates | 2/24/23 |
204 | Composite Natural Sand Stockpiles | 12/1/06 |
300 | Asphalt Materials |
301 | Certified Hot Mix Asphalt Producer Program Procedures | 3/7/22 |
302 | Asphalt Materials | 2/6/24 |
303 | Plate Sample Preparation and SUPERPAVE Gyratory Compactor (SGC) Specimen Fabrication | 8/5/21 |
304 | QC/QA Hot Mix Asphalt Procedures | 2/6/24 |
305 | Hot Mix Asphalt Mix Design Laboratory Requirements | 10/01/24 |
306 | Specific Gravity of Fine Aggregates from Extracted Samples | 7/6/23 |
400 | Concrete Materials |
401 | Portland Cements and Pozzolans | 1/1/13 |
500 | Soils |
502 | Soil Laboratory Testing for Dynamic Cone Penetrometer Criteria | 6/1/18 |
600 | Miscellaneous Materials |
601 | General Procedures for Controlling Materials Approved Prior to Delivery to the Contract | 4/1/09 |
602 | Structural Member Fabrication | 9/14/11 |