Article
Standard Drawings, Sept 2008, Metric Drawings
Standard Drawings |
English Metric |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Revised & New Drawings Effective 09/01/08 |
Effective for Lettings on or after September 1, 2008 |
Metric Standard Drawings |
Last Updated: 3/4/19
Ref. |
Title | Description | Date |
401-REBS-01 | Ramp Entrance Terminal HMA Shoulder | Ramp Entrance with Bituminous Shoulder | 9/2/08 |
501-RECS-01 | Ramp Entrance Terminal Concrete Shoulder | Ramp Entrance Concrete Shoulder | 9/2/08 |
501-RECS-02 | Ramp Exit Terminal Concrete Shoulder | Ramp Exit Concrete Shoulder | 9/2/08 |
503-CCPJ-08 | Longitudinal Construction Joint | PCCP Joints | 9/2/08 |
601-CWGS-02 | Curved W-Beam Guardrail System | Curved W-Beam Guardrail System | 9/2/08 |
601-CWGS-04 | Curved W-Beam Guardrail System | Curved W-Beam Guardrail System | 9/2/08 |
601-NWGA-01 | Nested Guardrail for Large Drainage Structures | Nested W-Beam Guardrail Assembly | 9/2/08 |
605-CCSJ-01 | Concrete & Bituminous Curbs Sawed Joints | Concrete Curbs Sawed Joints | 9/2/08 |
610-DRIV-08 | Class I & III Drive Grade Profiles | Drives | 9/2/08 |
706-TTBP-05 | Concrete Bridge Railing Transition–Type TPS-1 | Transition Type Bridge Parapet | 9/2/08 |
707-BEBP-01 | Elastomeric Bearing Pads – Type 1 & 2 | Bridge Elastomeric Bearing Pads | 9/2/08 |
707-BEBP-02 | Elastomeric Bearing Pads – Type 3 & 4 | Bridge Elastomeric Bearing Pads | 9/2/08 |
707-BEBP-03 | Elastomeric Bearing Pads – Type 5, 6 & 7 | Bridge Elastomeric Bearing Pads | 9/2/08 |
707-BPBF-03 | Prestressed Beam Fabrication Tolerances | Bridge Precast Beam Fabrication | 9/2/08 |
715-BKFL-01 | Method 1, New Roadway, Trench | Pipe Backfill | 9/2/08 |
715-BKFL-02 | Method 1, New Roadway, Embankment | Pipe Backfill | 9/2/08 |
715-BKFL-03 | Method 1, Existing Asphalt Roadway, Trench | Pipe Backfill | 9/2/08 |
715-BKFL-04 | Method 1, Existing PCCP Roadway, Trench | Pipe Backfill | 9/2/08 |
715-BKFL-05 | Method 1, Existing Composite Roadway, Trench | Pipe Backfill | 9/2/08 |
715-BKFL-06 | Method 2, New or Existing Drive, Trench | Pipe Backfill | 9/2/08 |
715-BKFL-07 | Method 2, New or Existing Drive, Embankment | Pipe Backfill | 9/2/08 |
715-BKFL-08 | Method 3, Median Installation, Trench | Pipe Backfill | 9/2/08 |
715-BKFL-09 | Method 1, Median Installation, Embankment | Pipe Backfill | 9/2/08 |
715-PASD-01 | Pipe Anchor Strap Details | Pipe Anchor Strap Details | 9/2/08 |
720-CBST-01 | Catch Basin – Type A | Catch Basin Structure | 9/2/08 |
720-CBST-04 | Catch Basin – Type J | Catch Basin Structure | 9/2/08 |
720-INST-01 | Inlet – Type A | Inlet Structure | 9/2/08 |
720-INST-02 | Inlet – Type B & C | Inlet Structure | 9/2/08 |
720-INST-05A | Inlet – Type H | Inlet Structure | 9/2/08 |
720-INST-06 | Inlet – Type J | Inlet Structure | 9/2/08 |
720-INST-07 | Inlet – Type M & R | Inlet Structure | 9/2/08 |
801-TCDV-03 | Merging or Shifting Taper | Traffic Control Devices | 9/2/08 |
802-SNGP-06 | Sign Data Tables | Sign Placement | 9/2/08 |
Contact Information
Elizabeth Phillips
Design Resources Engineer
(317) 232-6775
ephillips@indot.in.gov