205 |
TECD |
02 |
Temporary Erosion Control Ditch | Temporary Check Dam, Straw Bales | 3/1/05 |
402 |
TMPT |
01 | Pavement Treatment Termination | Termination of Mainline Pavement Overlay | 3/1/05 |
503 |
CCPJ |
01 | PCCP Joints | Type D-1 Contraction Joint | 3/1/05 |
503 |
CCPJ |
06 | PCCP Joints | Transverse Joint Seals | 3/1/05 |
601 |
BAGR |
02 | Bridge Approach Guardrail | Median Bridge Approach Guardrail | 3/1/05 |
601 |
GRET |
07 |
Guardrail End Treatment | Grading at Guardrail End Treatments | 3/1/05 |
601 |
MPPG |
03 | Median Pier Protection Guardrail | Median Pier Protection Guardrail | 3/1/05 |
601 |
MPPG |
04 |
Median Pier Protection Guardrail | Median Pier Protection Guardrail | 3/1/05 |
601 |
MTGR |
01 | Thrie Beam Guardrail | Thrie Beam & Double Face Thrie Beam Guardrail | 3/1/05 |
601 |
RHPG |
01 | Road Hazard Protection Guardrail | Roadside Hazard Protection Guardrail | 3/1/05 |
601 |
RHPG |
02 | Road Hazard Protection Guardrail | Roadside Hazard Protection Guardrail | 3/1/05 |
601 |
RHPG |
03 | Road Hazard Protection Guardrail | Roadside Hazard Protection Guardrail | 3/1/05 |
601 |
RHPG |
04 | Road Hazard Protection Guardrail | Roadside Hazard Protection Guardrail | 3/1/05 |
601 |
TMTT |
01 | Double Faced Thrie Beam GR Transition | Thrie Beam to Thrie Beam Transition, TTT | 3/1/05 |
601 |
TTMS |
01 | Double Faced Thrie Beam GR Transition | DF Thrie Beam Transition to GRET Type MS | 3/1/05 |
601 |
TWGB |
01 | Guardrail Transition Type WGB | Guardrail Transition Type WGB | 3/1/05 |
601 |
TWGT |
01 | W-Beam GR to Thrie Beam Transition | W-Beam to Thrie Beam GR Transition Type WGT | 3/1/05 |
602 |
CCMB |
04 |
Concrete Median Barrier | Concrete Barrier | 3/1/05 |
604 |
SWCR |
02 | Sidewalk Curb Ramps | Sidewalk Curb Ramp General Notes & Details | 3/1/05 |
604 |
SWCR |
09 | Sidewalk Curb Ramps | Curb Ramps Type G & H | 3/1/05 |
610 |
DRIV |
02 | Drives | Class I Drive Sidewalk Not Adjacent to Curb | 3/1/05 |
610 |
DRIV |
06 | Drives | Class II, IV, & V Drives Approach Grades | 3/1/05 |
610 |
MBAP |
01 | Mailbox Approach Plan Views | Mailbox Approach Plan Views | 3/1/05 |
610 |
MBAP |
02 | Mailbox Approach Plan Views | Mailbox Approach Low Speed Low Traffic | 3/1/05 |
611 |
MBAS |
01 | Mailbox Assembly | Single Mailbox Assembly | 3/1/05 |
611 |
MBAS |
02 | Mailbox Assembly | Double Mailbox Assembly | 3/1/05 |
611 |
MBAS |
03 | Mailbox Assembly | Mailbox Support Hardware | 3/1/05 |
611 |
MBAS |
04 | Mailbox Assembly | Elevation Views | 3/1/05 |
706 |
BCBR |
01 | Bridge Concrete Barrier Rail | Common Height Concrete Bridge Railing | 3/1/05 |
706 |
BRPP |
01 |
Bridge Railing Parapet Pedestrian | Railing Type PF-1 | 3/1/05 |
706 |
CBRT |
02 |
Concrete Bridge Railing Transition | Concrete Bridge Railing Transition TBC or TBT | 3/1/05 |
706 |
TASE |
01 |
Transition Approach Slab Extension | Bridge Railing Transition TBC Slab Extension | 3/1/05 |
706 |
TBRC |
01 | Retrofit Thrie Beam Bridge Railing | Retrofit Thrie Beam Bridge Railing TR | 3/1/05 |
706 |
TBRC |
02 | Retrofit Thrie Beam Bridge Railing | Retrofit Thrie Beam Bridge Railing | 3/1/05 |
706 |
TBRC |
03 | Retrofit Thrie Beam Bridge Railing | Retrofit Thrie Beam Bridge Railing TR Components | 3/1/05 |
706 |
TBRE |
01 |
Retrofit Thrie Beam Bridge Railing | Components | 3/1/05 |
706 |
TBRF |
01 |
Retrofit Thrie Beam Bridge Railing | TR Components | 3/1/05 |
706 |
TBRF |
02 | Retrofit Thrie Beam Bridge Railing | TR Components | 3/1/05 |
711 |
BSTS |
01 |
Bridge Steel Shoes | Steel Shoe Details | 3/1/05 |
715 |
BKFL |
02 | Backfill | Pipe Structure Backfill Embankment Installations | 3/1/05 |
715 |
BKFL |
04 | Backfill | Pipe Structure Backfill Trench Installations | 3/1/05 |
715 |
BKFL |
06 | Backfill | Pipe Structure Backfill Median Installations | 3/1/05 |
715 |
BKFL |
08 | Backfill | Pipe Structure Backfill Driveway Installations | 3/1/05 |
715 |
BKFL |
09 | Backfill | Pipe Structure Backfill General Notes | 3/1/05 |
720 |
CDSC |
01 | Drainage Structures & Castings | Drainage Structure/Casting Compatibility | 3/1/05 |
724 |
BSSJ |
06 | Bridge SS Joints | Expansion Joints Class SS | 3/1/05 |
801 |
TCCB |
02 | Traffic Control Median Barrier | Barrier Reinforcement & Connection Details | 3/1/05 |
801 |
TCCO |
01 | Traffic Control Crossovers | Temporary Crossover Advance Signing | 3/1/05 |
801 |
TCCO |
02 | Traffic Control Crossovers | Temporary Crossover Entrance Detail | 3/1/05 |
801 |
TCCO |
03 | Traffic Control Crossovers | Temporary Crossover Exit Detail | 3/1/05 |
801 |
TCDV |
01 | Traffic Control Devices | Channelizing Devices | 3/1/05 |
801 |
TCDV |
06 | Traffic Control Devices | Type III Barricade Typical Applications | 3/1/05 |
801 |
TCLG |
01 | Traffic Control Legend | Traffic Control Legend & General Notes | 3/1/05 |
802 |
SNGP |
05 | Sign Placement | Sign Data Tables | 3/1/05 |
802 |
SNOH |
15 | Sign Overhead | Sign Structure Truss – Aluminum Details | 3/1/05 |
805 |
SGMA |
03 | Signal Mast Arm | Signal Cantilever Foundation Detail | 3/1/05 |
805 |
SGMA |
07 | Signal Mast Arm | Foundation Data & General Notes | 3/1/05 |
808 |
MKNB |
03 |
Markings Narrow Bridge | Placement of Traffic Control Devices | 3/1/05 |