Indiana Department of Transportation
INDOT > Doing Business with INDOT > Standards & Specifications > Standard Drawings > Sept 2010 > Metric Sections 400 & 500 Metric Sections 400 & 500
Standard Drawings |
English Metric |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Revised & New Drawings Effective 09/01/10 |
Effective for Lettings on or after September 1, 2010 |
Section 400 - Asphalt Pavement Section 500 - Rigid Pavement |
Last Updated: 5/8/13
Ref. |
Title | Description | Date |
400-PTRN-01 | Pavement Type Transition | Existing PCCP to New HMA Pavement | 9/1/99 |
401-REBS-01 | Ramp Entrance Terminal HMA Shoulder | Entrance Ramp with Asphalt Shoulder | 9/2/08 |
401-REBS-02 | Ramp Exit Terminal HMA Shoulder | Exit Ramp with Asphalt Shoulder | 1/4/99 |
401-REBS-03 | Ramp Cross Sections HMA Shoulder | Exit Ramp with Asphalt Shoulder | 9/1/00 |
401-REBS-04 | Ramp Terminal Tables | Acceleration-Lane Lengths | 6/3/96 |
402-NVUF-01 | HMA Nonmotorized-Vehicle-Use Facility Pavement Section | Nonmotorized-Vehicle-Use Facility | 9/1/10 |
402-NVUF-02 | HMA Nonmotorized-Vehicle-Use Facility Pavement Section on Abandoned-Railroad Corridor | Nonmotorized-Vehicle-Use Facility | 9/1/10 |
500-PTRN-01 | Pavement Type Transition | Existing HMA Pavement to New PCCP | 9/1/99 |
500-PTRN-02 | Pavement Type Transition | Existing Composite Pavement to New PCCP | 1/3/00 |
500-PTRN-03 | Pavement Type Transition | Existing Composite Pavement to New Thicker PCCP | 9/1/99 |
500-PTRN-04 | Pavement Type Transition | Existing PCCP to New PCCP | 9/1/99 |
501-RECS-01 | Ramp Entrance Terminal Concrete Shoulder | Entrance Ramp with Concrete Shoulder | 9/2/08 |
501-RECS-02 | Ramp Exit Terminal Concrete Shoulder | Exit Ramp with Concrete Shoulder | 9/2/08 |
501-RECS-03 | Ramp Cross Sections Concrete Shoulders | Exit Ramp with Concrete Shoulder | 1/4/99 |
502-NVUF-01 | PCCP Nonmotorized-Vehicle-Use Facility Pavement Section | Nonmotorized-Vehicle-Use Facility | 9/1/10 |
503-CCPJ-01 | Type D-1 Contraction Joint | Longitudinal Section Through PCCP | 9/4/07 |
503-CCPJ-02 | Longitudinal Joint | Cement Concrete Pavement Joints | 9/1/99 |
503-CCPJ-03 | Longitudinal Joint | Sawed-Longitudinal-Joint Sealing Options | 3/1/04 |
503-CCPJ-04 | Longitudinal Keyway Joint | Plans & Elevations | 9/1/99 |
503-CCPJ-05 | Transverse Construction Joint | Retrofit Tie-Bar Embedment | 9/1/99 |
503-CCPJ-06 | Transverse Joint Seals | Type D-1 Sawed Construction Joint | 3/1/05 |
503-CCPJ-07 | Longitudinal Construction Joint | Tie-Bars Placement | 9/1/99 |
503-CCPJ-08 | Longitudinal Construction Joint | Retrofit Tie-Bar Embedment | 9/1/09 |
506-CCPP-01 | Concrete Pavement Patch Details | PCCP Patching | 9/1/10 |
507-RLTC-01 | Retrofit Dowel Slot & Bar Details | Dowel Slot | 9/1/04 |
507-RLTC-02 | Retrofit Dowel Slot & Bar Location | Retrofit Load Transfer | 9/1/04 |