Article
Standard Drawings, Sept 2007, Metric Drawings
Standard Drawings |
English Metric |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Revised & New Drawings Effective 09/01/07 |
Effective for Lettings on or after September 1, 2007 |
Metric Standard Drawings |
Last Updated: 3/5/19
Ref. |
Title | Description | Date |
205-TECD-01 | Temporary Check Dam, Revetment Rip Rap | Temporary Erosion Control Ditch | 09/04/07 |
205-TECD-02 | Temporary Check Dam, Straw Bales | Temporary Erosion Control Ditch | 09/04/07 |
205-TECS-02 | Temporary Slope Drain | Temporary Erosion Control Slope | 09/04/07 |
303-STRW-01 | Shoulder Treatment for Resurfacing Work | Shoulder Treatment Resurfacing Work | 09/04/07 |
306-TMPT-01 | HMA Pavement Wedging/Transition Milling | HMA Pavement Wedging/Transition Milling | 09/04/07 |
503-CCPJ-01 | Type D–1 Contraction Joint | PCCP Joints | 09/04/07 |
610-DRIV-01 | Class I Drive | Drives | 09/04/07 |
610-DRIV-02 | Class II Drive | Drives | 09/04/07 |
610-DRIV-03 | Class III Drive | Drives | 09/04/07 |
610-DRIV-04 | Class IV Drive | Drives | 09/04/07 |
610-DRIV-06 | Class VI Drive Plan & Sections | Drives | 09/04/07 |
610-DRIV-08 | Class I & III Drive Grade Profiles | Drives | 09/04/07 |
610-DRIV-12 | Class VII Drive Profile Grade & Detail A | Drives | 09/04/07 |
610-DRIV-13 | Drives General Notes & Legend | Drives | 09/04/07 |
610-DRIV-15 | Class VII Drive Plan & Profile Grade | Drives | 09/04/07 |
610-DRIV-16 | Class VII Drive Joint Placement & Corners | Drives | 09/04/07 |
610-DRIV-17 | Private Drive Crossovers Plans | Drives | 09/04/07 |
610-DRIV-18 | Private Drive Crossovers Cross Sections | Drives | 09/04/07 |
610-DRIV-19 | Commercial Drive Crossovers Plans | Drives | 09/04/07 |
610-PRAP-04 | Public Road Approach Types A & B | Public Road Approach | 09/04/07 |
610-PRAP-08 | Public Road Approach Type C | Public Road Approach | 09/04/07 |
610-PRAP-11 | Public Road Approach Type D | Public Road Approach | 09/04/07 |
706-BCBR-02 | Truck Height Concrete Bridge Railing | Bridge Concrete Barrier Rail | 09/04/07 |
706-BCBR-04 | Concrete Bridge Railing | Bridge Concrete Barrier Rail | 09/04/07 |
706-BRPP-02 | Railing Type PF–2 | Bridge Railing Parapet Pedestrian | 09/04/07 |
706-BRPP-04 | Railing Type PS–2 | Bridge Railing Parapet Pedestrian | 09/04/07 |
706-TASE-05 | Bridge Railing Transition Slab Extension | Transition Approach Slab Extension | 09/04/07 |
707-SDPC-01 | AASHTO I–Beams | Steel Diaphragms | 09/04/07 |
707-SDPC-02 | AASHTO I–Beams | Steel Diaphragms | 09/04/07 |
707-SDPC-03 | Indiana Bulb–Tees, 1372 mm Depth | Steel Diaphragms | 09/04/07 |
707-SDPC-04 | Indiana Bulb–Tees, 1372 mm Depth | Steel Diaphragms | 09/04/07 |
707-SDPC-05 | Indiana Bulb–Tees, 1524 mm Depth | Steel Diaphragms | 09/04/07 |
707-SDPC-06 | Indiana Bulb–Tees, 1524 mm Depth | Steel Diaphragms | 09/04/07 |
714-CCSP-02 | Three–Sided Concrete Culvert Scour Protection | Concrete Culvert Scour Protection | 09/04/07 |
715-BKFL-01 | Method 1, New Roadway, Trench | Pipe Backfill | 09/04/07 |
715-BKFL-02 | Method 1, New Roadway, Embankment | Pipe Backfill | 09/04/07 |
715-BKFL-03 | Method 1, Existing HMA Roadway, Trench | Pipe Backfill | 09/04/07 |
715-BKFL-04 | Method 1, Existing PCCP Roadway, Trench | Pipe Backfill | 09/04/07 |
715-BKFL-05 | Method 1, Existing Composite Roadway, Trench | Pipe Backfill | 09/04/07 |
715-BKFL-06 | Method 2, Class II, IV, V & VI Drives, Trench | Pipe Backfill | 09/04/07 |
715-BKFL-07 | Method 2, Class II, IV, V & VI Drives, Embankment | Pipe Backfill | 09/04/07 |
715-BKFL-08 | Method 3, Median Installation, Trench | Pipe Backfill | 09/04/07 |
715-BKFL-09 | Method 1, Median Installation, Embankment | Pipe Backfill | 09/04/07 |
715-BKFL-10 | Pipe Backfill Limit Determination | Pipe Backfill | 09/04/07 |
(now unassigned) | |||
722-HMAW-01 | HMA Pavement Wedge at Reinforced Concrete Bridge Approach | Pavement Wedge | 09/04/07 |
724-BSSJ-04 | Expansion Joints Class SS | Bridge SS Joints | 09/04/07 |
801-TCDV-01 | Channelizing Devices | Traffic Control Devices | 09/04/07 |
801-TCDV-10 | Worksite Speed Limit Sign Assembly | Traffic Control Devices | 09/04/07 |
801-TCSN-12 | Sign Design Details | Traffic Control Signs | 09/04/07 |
801-TCSN-12A | Sign Design Details | Traffic Control Signs | 09/04/07 |
801-TCTC-12 | Tubular Marker Delineation at Intersection | Traffic Control Temporary Closure | 09/04/07 |
805-SGCO-05 | Pedestal Mounted Signal Indications | Signal Controller | 09/04/07 |
Contact Information
Elizabeth Phillips
Design Resources Engineer
(317) 232-6775
ephillips@indot.in.gov