Construction Management Resources
- Work Zone Safety
- Change Order Resources:
- Construction Memos
- Contract Documents
- District Claims Worksheet
- FHWA Construction PODI List
- FHWA Form 1273
- Eligibility for Anchored Concrete Barrier Wall
- General Instructions to Field Employees (GIFE)
- INDOT Guidelines for Setting Contract Time
- LPA & State Shop Drawing & Falsework Review Procedure
- Partnering Handbook for INDOT Projects
- Standard Specifications & Drawings, Special Provisions
EEO Policy Directives
Construction Inspection Videos/Presentations
Procedures and Documents for SiteManager Contracts
Select this ERMS location to access the following documents:
- Certification for Temporary Traffic Control Devices
- e-Ticket FCR Documentation Guide
- Final Construction Record (FCR) Guide
- Final Description and Elevation of Benchmarks (SF 3031)
- IC-113 Signature Affidavit
- IC-149 Property Release
- IC-203 Request for Acceptance of Borrow or Disposal Site
- IC-225 Pile Driving Record
- IC-625 Salvage Construction Material Record
- IC-699 Checklist for Final Construction Record Index
- IC-715 Mandrel Testing of Pipe Structures
- IC-740 Pile Driving Equipment Data Form
- INDOT Consultant New User for ProjectWise
- Intelligent File Cabinet Document Naming Convention Guidance
- Notice of Termination (SF 51514)
- Pre-Construction Conference Agenda
- Progress Meeting Agenda
- ProjectWise for Construction User Guide (Intelligent FCR and File Cabinet)
- Railroad 15 day Expiration Letter
- Railroad Release Letter
- Signature Request Letter for DBE
- Signature Request Letter for MBE/WBE/IVBE
- The INDOT Consultant New User Quick Start Guide for Projectwise can be found here: INDOT: ProjectWise
- Warranty Final Acceptance Letter
IRI Information
Note: For all current contracts and contracts let after 1/1/2020:
- Certified Profilers & Operators
- IRI Field Guide
- IRI Field Guide for ALR
- IRI Payment Adjustment Spreadsheet - HMA
- IRI Payment Adjustment Spreadsheet - PCCP
- IRI Data Submission Form
Note: Optional for contracts prior to 1/1/2023:
Note: For contracts let prior to 1/1/2020:
- IRI Inertial Profiler HMA Adjusted Calculations
- IRI Inertial Profiler PCCP Adjusted Calculations
- IRI Inertial Profiler Testing Grinding Summary Sheet
- IRI Field Guide Calculations
E-Ticketing Information
DOT Personnel
- Active E-Ticketing Suppliers List
- E-Ticketing (DOTslip)
- E-Ticket FCR Documentation Guide
- DOT PORTAL & DOTslip Training Video
- DOT PORTAL & DOTslip User Guide
- DOT Portal &DOTslip for Mobile and Web
Contractors & Suppliers
- Frequently Asked Questions & How to Sign Up
- DOT PORTAL & JOBslip User Guide
- DOT Portal & JOBslip for Mobile and Web
Construction Applications and Tools
- Field Assistant (Offline DWR & Test Result Entry)
- CFA (Storm Water Reporting)
- CARS
- ITAP
- Citrix Log-in
- SiteManager Reports Page
- IMUTCD (Traffic Control Manual)
- Equipment Watch
Personnel Development and Tools
- SiteManager Manuals (incl. CPMS, Field Assistant, DMF Manuals, more)
- Highway Technician Course Manuals
- Storm Water Training
- Storm Water Certified Personnel
- Storm Water Management Field Guide
- PeopleSoft Log-in (Time & Labor)
- State Employee Benefits Information
- Training & Certifications
Materials Resources
- Qualified Products & Qualified Sources Lists
- ASTM Test Methods & Procedures
- Directive 109
- Division of Materials and Tests Public Site
- FrequencyManual (SM)
- ITM Test Methods & Procedures
- Materials Certification Guide
- Pipe Manual
- Type A Certification Manual
- Type B Certification Manual
Contact Information
Construction Management Support
100 N. Senate Ave, IGCN Suite 758-CM
Indianapolis, IN 46204
Email: cmsupport@indot.in.gov