Article
Standard Drawings |
Section 100 |
Section 200 |
Section 300 |
Section 400 |
Section 500 |
Section 600 |
Section 700 |
Section 800 |
Drawing Series & Numbers |
Drawing Title | Eff. Date |
E 601-CWGS
E 601-CWGS-01 |
Curved W-Beam Guardrail System
Guardrailed Public Road Approach at Bridge End (rev. 09/04/12, format update only) |
09/04/12 Revision Notes |
E 601-CWGT
E 601-CWGT-01 |
Curved W-Beam Guardrail Terminal System
Guardrailed Drive at Bridge End (eff. 09/02/03) |
03/01/04 |
E 601-GAIA
E 601-GAIA-01 |
Grading at Median Impact Attenuator
Alignment of Attenuator, Pad & Roadway (eff. 03/01/02) |
03/01/02 |
E 601-GCTA
E 601-GCTA-01 |
Cable Terminal Anchor System
End Panel Plan & Elevation (eff. 09/04/01) |
09/04/01 |
E 601-GRBA
E 601-GRBA-01 |
Bridge-Approach Guardrail
Bridge-Approach Guardrail 2-Lane 2-Way Roadway (eff. 09/01/11) |
09/01/11 |
E 601-GRBS
E 601-GRBS-01 |
Guardrail at Roadside Bridge Support
Median Pier Protection, 2-Lane 2-Way Roadway, Single Overhead Struct. (eff. 09/01/11) |
09/01/11 |
E 601-GRET
E 601-GRET-04 |
Guardrail End Treatment
Guardrail End Treatment Type I Layout (eff. 04/03/95) |
09/01/06 Revision Notes |
E 601-IAED
E 601-IAED-01 |
Impact Attenuator ED
Impact Attenuator ED Layout (eff. 03/01/02) |
03/01/02 |
E 601-MGSA
E 601-MGSA-01 |
Midwest Guardrail System Assembly
Drawing Index and General Notes |
09/01/18 Revision Notes |
E 601-MTGR
E 601-MTGR-01 |
Thrie Beam Guardrail
Thrie Beam & Double Face Thrie Beam Guardrail Details (eff. 09/01/11) |
09/01/11 |
E 601-NWGA
E 601-NWGA-01 |
Nested Guardrail
25'-0" Span Nested Guardrail for Large Drainage Structure (editorial rev.
09/01/17) |
09/01/17 Revision Notes |
E 601-RHPG
E 601-RHPG-01 |
Road Obstruction Protection Guardrail
Roadside Obstruction Protection Guardrail Index and General Notes (rev. 09/01/19) |
09/01/19 Revision Notes |
E 601-TBGC
E 601-TBGC-01 |
Thrie-Beam Guardrail Components
Thrie-Beam Rail Section, Terminal Connector, Transition (rev, 09/01/18) |
09/01/18 Revision Notes |
E 601-TMTT
E 601-TMTT-01 |
Thrie Beam to Thrie Beam Transition, TTT
Thrie-Beam Guardrail to Thrie Beam Guardrail Transition, TTT (eff. 09/01/11) |
09/01/11 |
E 601-TPGP
E 601-TPGP-01 |
Transition at Pier Type GP
Attachment at Square Nose Pier (eff. 11/15/99, format update only) |
09/01/98 |
E 601-TTGB
E 601-TTGB-01 |
Guardrail Transition Type TGB
Plan and Elevation (eff. 09/01/11) |
09/01/11 |
E 601-TTGP
E 601-TTGP-01 |
Guardrail Transition Type GP
Lap Detail, Post and Block Details (eff. 09/01/11) |
09/01/11 |
E 601-TTGT
E 601-TTGT-01 |
Transition Type TGT, Thrie Guardrail Top
Guardrail Transition Type TGT Plan & Elevation (eff. 09/01/11) |
09/01/11 |
E 601-TTMS
E 601-TTMS-01 |
DF Thrie Beam Transition to GRET Type MS
Double-Faced Thrie-Beam Guardrail Transition (eff. 09/01/11) |
09/01/11 |
E 601-TTVH
E 601-TTVH-01 |
Guardrail Transition Type VH
Transition at 6'-3" Post Spacing (eff. 09/01/11) |
09/01/11 |
E 601-TWGB
Guardrail Transition Type WGB (del. 09/01/19)
|
09/01/19 |
Revision Notes |
E 601-TWGT
E 601-TWGT-01 |
W-Beam to Thrie-Beam Guardrail Transition Type WGT
W-Beam to Thrie-Beam Guardrail Transition (edit. 09/01/19) |
09/02/14 Revision Notes |
E 601-WBGA
E 601-WBGA-01 |
W-Beam Guardrail Assemblies
Typical Installations (eff. 09/01/11) |
09/01/11 Revision Notes |
E 601-WBGC
E 601-WBGC-01 |
W-Beam Guardrail Components
Backup Plate, W-Beam Element (eff. 03/03/03) |
09/01/04 |
E 602-CCMB
E 602-CCMB-01 |
Concrete Median Barrier
Drain & Joint Placement Plans & Sections (eff. 03/03/03) |
09/01/06 |
E 603-CLTF
E 603-CLTF-01 |
Chain Link Type Fence
Right-of-Way Fence Elevation, Post Chart (eff. 03/01/06) |
03/01/06 |
E 603-FFTF
E 603-FFTF-01 |
Farm Field Type Fence
Farm Field Type Fence Elevation, Post Chart (eff. 09/01/04) |
09/01/04 |
E 604-CCSJ
E 604-CCSJ-01 |
Sidewalk Expansion Joint
Sidewalk Expansion Joint, Silicone Joint (eff. 09/01/15) |
09/01/15 Revision Notes |
E 604-NVUF
E 604-NVUF-01 |
Nonmotorized-Vehicle-Use Facility, HMA Pavement
Pavement Section (rev. 09/01/17) |
09/01/17 Revision Notes |
E 604-SDWK
E 604-SDWK-01 |
Sidewalk Details
Sidewalk Details Sidewalk with Buffer (rev. 09/01/16) |
09/01/16 Revision Notes |
E 604-SWCR
E 604-SWCR-01 |
Sidewalk Curb Ramps
Curb Ramp Drawing Index and General Notes (rev. 09/01/18) |
09/01/18 Revision Notes |
E 605-CCCG
E 605-CCCG-01 |
Combined Concrete Curb & Gutter
Combined Concrete Curb & Gutter (eff. 09/01/11) |
09/01/11 |
E 605-CCIN
E 605-CCIN-01 |
Integral Concrete Curb
Types Barrier, Mountable B, Barrier C, and Alternate (edit. 09/01/19) |
09/01/04 Revision Notes |
E 605-CCSJ
E 605-CCSJ-01 |
Concrete Curbs, Asphalt Curbs, & Sawed Joints
Concrete Curbs, HMA Curbs, & Sawed Joints (rev. 09/02/14, editorial only) |
09/02/14 Revision Notes |
E 605-CGCS
E 605-CGCS-01 |
Concrete Gutter & Curb Stirrup Bending Diagram
Concrete Gutter & Curb Stirrup Bending Diagram (rev. 11/15/99, format update only) |
04/03/95 |
E 605-CNCB
E 605-CNCB-01 |
HMA Center Curb
HMA Center Curb Type A (eff. 01/03/00) |
01/03/00 |
E 605-CNCC
E 605-CNCC-01 |
Concrete Center Curbs
Concrete Center Curb Type A (eff. 01/02/01) |
03/01/04 |
E 605-CTCG
E 605-CTCG-01 |
Curb Turnout to Concrete Gutter
Combined Curb & Gutter Turnouts (eff. 03/03/03) |
03/03/03 |
E 605-CTIN
E 605-CTIN-01 |
Curb Turnout to A-3 Inlet
Curb Turnout to A-3 Inlet (rev. 11/15/99, format update only) |
09/01/97 |
E 605-ERCN
E 605-ERCN-01 |
Ear Construction
Ear Construction Type A & B (rev. 09/01/19) |
09/01/19 Revision Notes |
E 605-GTRC
E 605-GTRC-01 |
Reinforced Concrete Gutter Turnout
Sections & Details (eff. 03/03/03) |
03/03/03 |
E 605-TSCS
E 605-TSCS-01 |
Transition of Earth Shoulder to Curb Section
Two-Lane Roadway Plan and Section (rev. 11/15/99, format update only) |
09/01/97 |
E 606-SHCG
E 606-SHCG-01 |
Pavement Corrugations, Rumble Strips, and Rumble Stripes
Pavement Corrugations, Index and General Notes (rev. 09/01/19) |
09/01/19 Revision Notes |
E 607-PSDT
E 607-PSDT-01 |
Paved Side Ditch
Paved Side Ditch Elevations Types A-H and J-M (eff. 03/03/03) |
03/03/03 |
E 608-SHDR
E 608-SHDR-01 |
Shoulder Drain
Should Drain Plan & Elevation (rev. 11/15/99, format update only) |
05/01/98 |
E 609-BRJT
E 609-BRJT-01 |
Type I-A Joint
Type I-A Section View (edit. 09/01/20) |
09/04/12 Revision Notes |
E 609-RCBA
E 609-RCBA-01 |
Reinforced Concrete Bridge Approach
Reinforced Concrete Bridge Approach Index and General Notes (rev. 09/01/20) |
09/01/20 Revision Notes |
E 609-TBAE
E 609-TBAE-01 |
RCBA Extension for Bridge Railing Transition (prev. E 706-TASE)
Extension for Transition TFC, TPF-1, TPF-2, TPS-1, or TPS-2 (rev. 09/03/13, editorial only) |
09/03/13 Revision Notes |
E 610-DRIV
E 610-DRIV-01 |
Drives
Index General Notes and Legend (rev. 09/01/19) |
09/01/19 Revision Notes |
E 610-MBAP
E 610-MBAP-01 |
Mailbox Approaches
Mailbox Approaches High Speed Roadway (rev. 09/02/14, editorial only) |
09/02/14 Revision Notes |
E 610-PRAP
E 610-PRAP-01 |
Public Road Approach
Public Road Approach Index and General Notes (rev. 09/01/19) |
09/01/19 Revision Notes |
E 610-PRCO
E 610-PRCO-01 |
Public Road Crossovers
Public Road Crossover Section (eff. 03/03/03) |
03/03/03 |
E 610-UTMO
E 610-UTMO-01 |
U-Turn Median Opening
U-Turn Median Opening Plan & Sections (rev. 09/01/17) |
09/01/17 Revision Notes |
E 611-MBAS
E 611-MBAS-01 |
Mailbox Assemblies
Single Mailbox Assembly (eff. 03/01/05) |
03/01/05 Revision Notes |
E 615-RWPB
E 615-RWPB-01 |
Right-of-Way Marker and Concrete Parking Barrier
Right-of-Way Marker and Concrete Parking Barrier (eff. 03/01/04) |
03/01/04 |
E 615-SCMN
E 615-SCMN-01 |
Section Corner Monuments
New Installation or Extension of Existing (rev. 11/15/99, format update only) |
04/03/95 |
E 615-SLBM
E 615-SLBM-01 |
Survey Line Bench Mark
Bench Mark Post (rev. 11/15/99, format update only) |
09/01/97 |
E 615-SLMN
E 615-SLMN-01 |
Survey Line Monuments
Types A, B, C, D and Identification Sign (rev. 11/15/99, format update only) 09/01/97 |
|
E 616-SWCO
E 616-SWCO-01 |
Slopewall, Concrete
Concrete Slopewall Details (rev. 09/01/11) |
09/01/11 |
E 616-SWRR
E 616-SWRR-01 |
Slopewall, Riprap
Riprap Slopewall Details (rev. 09/01/11) |
09/01/11 |
E 617-CDIN
E 617-CDIN-01 |
Center Ditch Inlet
Center Ditch Inlet Parallel to Center Line Roadway (eff. 05/01/98) |
05/01/98 |
E 619-PRWS
E 619-PRWS-01 |
Painting Requirements for Weathering Steel
Beam Painting (eff. 09/01/11) |
09/01/11 |
E 622-LSPL
E 622-LSPL-01 |
Landscape Planting
Landscape Planting Index (new 09/01/18) |
09/01/18 Revision Notes |
E 622-LSPR
E 622-LSPR-01 |
Landscape Pruning Tree Pruning, Tall Shade Tree (rev. 11/15/99, format update only) |
04/03/95 |
E 622-LSSN
E 622-LSSN-01 |
Landscape Signs
Landscape Signs (rev. 11/15/99, format update only) |
06/03/96 |