Section 200 - Earthwork
Effective for Lettings on or after September 1, 2020
Last Updated: 05/18/20

Drawing Series & Numbers
Drawing Title
Eff. Date
E 205-TECD

E 205-TECD-01
E 205-TECD-02
E 205-TECD-03
E 205-TECD-04
E 205-TECD-05
E 205-TECD-06
E 205-TECD-07
E 205-TECD-08
E 205-TECD-09
E 205-TECD-10
E 205-TECD-11
E 205-TECD-12

Temporary Erosion Control

Temporary Erosion Control Index Sheet (rev. 09/01/19)
Temporary Inlet Protection, Filter Sock (rev. 09/01/19)
Temporary Inlet Protection, Gravel Ring (rev. 09/01/19)
Temporary Inlet Protection, Filter Bag Insert (new 09/01/19)
Temporary Curb Inlet Protection (new 09/01/19)
Temporary Check Dam, Revetment Riprap (new 09/01/19)
Temporary Check Dam, Traversable, Low Profile (new 09/01/19)
Temporary Check Dam, Traversable (new 09/01/19)
Temporary Sediment Trap (new 09/01/19)
Perimeter Protection, Filter Sock (new 09/01/19)
Perimeter Protection, Silt Fence (new 09/01/19)
Temporary Erosion Control Perimeter Construction Entrance (new 09/01/19)

09/01/19
Revision Notes
E 205-TECI Temporary Erosion Control Inlet (del. 09/01/19) 09/01/19
Revision Notes
E 205-TECP Temporary Erosion Control Perimeter (del. 09/01/19) 09/01/19
Revision Notes
E 205-TECS

E 205-TECS-01
E 205-TECS-02
E 205-TECS-03
E 205-TECS-04

Temporary Erosion Control Slope

Temporary Interceptor Ditch (edit. 09/01/19, format update only)
Temporary Slope Drain (eff. 09/01/10)
Temporary Slope Drain (edit. 09/01/19, format update only)
Temporary Erosion Control Slope Diversion Interceptors (new 09/04/12)

09/04/12
Revision Notes
E 211-BFIL

E 211-BFIL-01
E 211-BFIL-02
E 211-BFIL-03
E 211-BFIL-04
E 211-BFIL-05

Backfill

Part Plan for Flared Wings (edit. 09/01/19, format update only)
Flared Wings Typical Cross Section (edit. 09/01/19, format update only)
Backfill Placement Interior Bent or Pier (rev. 09/04/12, format update only)
Backfill Placement Behind End Bent Beam or Girder Structure (rev. 09/04/12, format update only)
Backfill Placement Behind End Bent Reinforced-Concrete Slab Bridge (rev. 09/04/12, format update only)

09/04/12