Article
Standard Drawings, Sept 2013, English Drawings
Standard Drawings |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Revised & New Drawings Effective 09/03/13 |
Effective for Lettings on or after September 3, 2013 |
English Standard Drawings--Revised and New |
Last Updated: 3/4/19
Drawing Series & Numbers |
Drawing Title | Eff. Date |
E 205-TECP
E 205-TECP-01 |
Temporary Erosion Control Perimeter
Temporary Erosion Control, Perimeter Construction Entrance (rev. 09/03/13, editorial only) |
09/03/13 Revision Notes |
E 609-TBAE
E 609-TBAE-01 |
RCBA Extension for Bridge Railing Transition (prev. E 706-TASE)
Extension for Transition TFC, TPF-1, TPF-2, TPS-1, or TPS-2 (rev. 09/03/13, editorial only) |
09/03/13 Revision Notes |
E 610-UTMO
E 610-UTMO-01 |
U-Turn Median Opening
(revised by RPD 610-R-604d, eff. 02/01/13)
U-Turn Median Opening Plan & Sections (rev. 09/03/13) |
09/03/13 Revision Notes |
E 706-TTFC
E 706-TTFC-01 |
Transition Thrie to FC (prev. E 706-TTBC)(revised by RPD 706-B-201d, eff. 01/01/13)
Concrete Bridge Railing Transition Type TFC Plan and Elevation (rev. 09/04/12) |
09/03/13
Revision Notes |
E 731-MSEW
E 731-MSEW-01 |
MSE Wall (prev. E 731-BRRW)
Precast Concrete Coping (rev. 09/03/13) |
09/03/13
Revision Notes |
E 802-DMSS
E 802-DMSS-01 |
Dynamic Message Sign Structure
(see RPD 802-T-184d, eff.
03/01/13)
Drawing Index (new 09/03/13) |
09/03/13 Revision Notes |
E 802-SBTS
E 802-SBTS-01 |
Sign Box Truss Structure
(see RPD 802-T-185d, eff. 03/01/13)
Drawing Index (new 09/03/13) |
09/03/13 Revision Notes |
E 802-SCLS
E 802-SCLS-01 |
Sign Cantilever Structure
(see RPD 802-T-186d, eff. 03/01/13)
Drawing Index (new 09/03/13) |
09/03/13 Revision Notes |
E 802-SNGP
E 802-SNGP-01 |
Sign Placement
(revised by RPD 802-T-182d, eff. 01/01/13)
Sign Placement (rev. 09/03/13) |
09/03/13 Revision Notes |
E 802-TCSS
E 802-TCSS-01 |
Tri-Chord Sign Structure
(see RPD 802-T-189d, eff. 04/01/13)
Drawing Index (new 09/03/13) |
09/03/13 Revision Notes |
E 805-SDAC
E 805-SDAC-01 |
Signal Dual Arm Cantilevers
(see RPD 805-T-187d, eff. 03/01/13)
Drawing Index (new 09/03/13) |
09/03/13 Revision Notes |
E 805-SGCF
E 805-SGCF-01 |
Signal Cabinet Foundation
Controller Cabinet Foundation Type P-1 (rev. 09/03/13, editorial only) |
09/03/13 Revision Notes |
E 805-SGSC
E 805-SGSC-01 |
Signal Poles and Cables
Guy Alignment and Anchor Bolt Orientation (rev. 09/03/13, editorial only) |
09/03/13 Revision Notes |
E 805-SGSP
E 805-SGSP-01 |
Signal Strain Pole
(revised by RPD 805-T-183d, eff.
01/01/13)
30 ft & 36 ft Signal Steel Strain Poles (eff. 09/01/05) |
09/03/13 Revision Notes |
E 805-TSCS
E 805-TSCS-01 |
Traffic Signal Cantilever Structure
Drawing Index (new 09/03/13) |
09/03/13 Revision Notes |