INDOT > Doing Business with INDOT > Standards & Specifications > Standard Drawings > September 2013 > English Sections 400 & 500
Standard Drawings |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Revised & New Drawings Effective 09/03/13 |
Effective for Lettings on or after September 3, 2013 |
Section 400 - Asphalt Pavements Download all Standard Drawings for Sections 400 & 500 (pdf 3.5 MB) |
Last Updated: 10/31/13
Drawing Series & Numbers |
Drawing Title | Eff. Date |
E 400-PRTN
E 400-PTRN-01 |
Pavement Type Transition
Existing PCCP to New HMA Pavement (eff. 09/01/99) |
09/01/99 |
E 401-REBS
E 401-REBS-01 |
Ramp Entrance/Exit, HMA Shoulder
Ramp Entrance Terminal (eff. 09/02/08) |
09/02/08 |
E 402-NVUF
E 402-NVUF-01 |
Nonmotorized-Vehicle-Use Facility, HMA Pavement
Pavement Section (eff. 09/01/10) |
09/01/10 |
E 500-PTRN
E 500-PTRN-01 |
Pavement Type Transition
Existing HMA Pavement to New PCCP (eff. 09/01/99) |
01/03/00 |
E 501-RECS
E 501-RECS-01 |
Ramp Entrance/Exit, Concrete Shoulder
Ramp Entrance Terminal (eff. 09/02/08) |
09/02/08 |
E 502-NVUF
E 502-NVUF-01 |
Nonmotorized-Vehicle-Use Facility, PCCP Pavement
Pavement Section (eff. 09/01/10) |
09/01/10 |
E 503-BATJ
E 503-BATJ-01 |
Reinforced Concrete Bridge Approach Terminal Joint
(prev. 609-RCBA)
RCBA Terminal Joint for Use with PCCP (rev. 09/04/12) |
09/04/12 Revision Notes |
E 503-CCPJ
E 503-CCPJ-01 |
Construction Joints
Type D-1 Contraction Joint (eff. 09/04/07) |
09/04/12 Revision Notes |
E 506-CCPP
E 506-CCPP-01 |
Concrete Pavement Patch
Concrete Pavement Patch Details (eff. 09/01/11) |
09/01/11 |
E 507-RLTC
E 507-RLTC-01 |
Retrofit Load Transfer, Concrete
Retrofit Dowel Slot and Bar Details (eff. 09/01/04) |
09/01/04 |