Doing Business with INDOT — Standards and Specifications
Effective for Lettings on or after September 1, 2006
Metric Standard Drawings
Section 400 – Asphalt Pavement
Section 500 – Rigid Pavement
Metric Standard Drawings
Section 400 – Asphalt Pavement
Section 500 – Rigid Pavement
Ref. |
Code |
Page |
Title |
Description |
Date |
400 |
PTRN |
01 |
Pavement Transitions | Pavement Type Transition | 9/1/99 |
401 |
REBS |
01 |
Ramp Entrance with Bituminous Shoulder | Ramp Entrance Terminal HMA Shoulder | 9/1/99 |
401 |
REBS |
02 |
Ramp Entrance with Bituminous Shoulder | Ramp Exit Terminal HMA Shoulder | 1/4/99 |
401 |
REBS |
03 |
Ramp Entrance with Bituminous Shoulder | Ramp Cross Sections HMA Shoulder | 9/1/00 |
401 |
REBS |
04 |
Ramp Entrance with Bituminous Shoulder | Ramp Terminal Tables | 6/3/96 |
500 |
PTRN |
01 |
Pavement Transitions | Pavement Type Transition | 9/1/99 |
500 |
PTRN |
02 |
Pavement Transitions | Pavement Type Transition | 1/3/00 |
500 |
PTRN |
03 |
Pavement Transitions | Pavement Type Transition | 9/1/99 |
500 |
PTRN |
04 |
Pavement Transitions | Pavement Type Transition | 9/1/99 |
501 |
RECS |
01 |
Ramp Entrance Concrete Shoulder | Ramp Entrance Terminal Concrete Shoulder | 9/1/00 |
501 |
RECS |
02 |
Ramp Entrance Concrete Shoulder | Ramp Exit Terminal Concrete Shoulder | 9/1/99 |
501 |
RECS |
03 |
Ramp Entrance Concrete Shoulder | Ramp Cross Sections Concrete Shoulders | 1/4/99 |
503 |
CCPJ |
01 |
PCCP Joints | Type D-1 Contraction Joint | 3/1/05 |
503 |
CCPJ |
02 |
PCCP Joints | Longitudinal Joint | 9/1/99 |
503 |
CCPJ |
03 |
PCCP Joints | Longitudinal Joint | 3/1/04 |
503 |
CCPJ |
04 |
PCCP Joints | Longitudinal Keyway Joint | 9/1/99 |
503 |
CCPJ |
05 |
PCCP Joints | Transverse Construction Joint | 9/1/99 |
503 |
CCPJ |
06 |
PCCP Joints | Transverse Joint Seals | 3/1/05 |
503 |
CCPJ |
07 |
PCCP Joints | Longitudinal Construction Joint | 9/1/99 |
503 |
CCPJ |
08 |
PCCP Joints | Longitudinal Construction Joint | 9/1/99 |
506 |
CCPP |
01 |
PCCP Patching | Concrete Pavement Patch Details | 3/1/06 |
507 |
RLTC |
01 |
Retrofit Load Transfer of PCCP | Retrofit Dowel Slot & Slot Details | 9/1/04 |
507 |
RLTC |
02 |
Retrofit Load Transfer of PCCP | Retrofit Dowel Slot & Bar Location | 9/1/04 |