INDOT > Doing Business with INDOT > Standards and Specifications > Standard Drawings > March 2005 > English Sections 400-500 English Sections 400 & 500
Standard Drawings |
English Metric |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Effective for Lettings on or after March 1, 2005 |
Section 400 - Asphalt Pavement Section 500 - Rigid Pavement |
Last Updated: 5/27/11
Spec Ref. |
Code |
Page |
Title | Description | Effective Date |
E400 |
PTRN |
01 |
Pavement Transitions | Pavement Type Transition | 9/1/99 |
E401 |
REBS |
01 |
Ramp Entrance with Bituminous Shoulder | Ramp Entrance Terminal HMA Shoulder | 9/1/99 |
E401 |
REBS |
02 |
Ramp Entrance with Bituminous Shoulder | Ramp Exit Terminal HMA Shoulder | 1/4/99 |
E401 |
REBS |
03 |
Ramp Entrance with Bituminous Shoulder | Ramp Cross Sections HMA Shoulder | 9/1/00 |
E401 |
REBS |
04 |
Ramp Entrance with Bituminous Shoulder | Ramp Terminal Tables | 6/3/96 |
E402 |
SHCG |
01 |
(Now Unassigned) | ||
E402 |
SHCG |
02 |
(Now Unassigned) | ||
E402 |
TMPT |
01 |
Pavement Treatment Termination | Termination of Mainline Pavement Overlay | 3/1/05 |
E500 |
PTRN |
01 |
Pavement Transitions | Pavement Type Transition | 9/1/99 |
E500 |
PTRN |
02 |
Pavement Transitions | Pavement Type Transition | 1/3/00 |
E500 |
PTRN |
03 |
Pavement Transitions | Pavement Type Transition | 9/1/99 |
E500 |
PTRN |
04 |
Pavement Transitions | Pavement Type Transition | 9/1/99 |
E500 |
SHCG |
01 |
(Now Unassigned) | ||
E500 |
SHCG |
02 |
(Now Unassigned) | ||
E501 |
CCPJ |
01 |
(Now Unassigned) | ||
E501 |
CCPJ |
02 |
(Now Unassigned) | ||
E501 |
CCPJ |
03 |
(Now Unassigned) | ||
E501 |
CCPJ |
04 |
(Now Unassigned) | ||
E501 |
CCPJ |
05 |
(Now Unassigned) | ||
E501 |
CCPJ |
06 |
(Now Unassigned) | ||
E501 |
CCPJ |
07 |
(Now Unassigned) | ||
E501 |
CCPJ |
08 |
(Now Unassigned) | ||
E501 |
CCPJ |
09 |
(Now Unassigned) | ||
E501 |
CCPJ |
10 |
(Now Unassigned) | ||
E501 |
CCPJ |
11 |
(Now Unassigned) | ||
E501 |
RECS |
01 |
Ramp Entrance Concrete Shoulder | Ramp Entrance Terminal Concrete Shoulder | 9/1/00 |
E501 |
RECS |
02 |
Ramp Entrance Concrete Shoulder | Ramp Exit Terminal Concrete Shoulder | 9/1/99 |
E501 |
RECS |
03 |
Ramp Entrance Concrete Shoulder | Ramp Cross Sections Concrete Shoulders | 1/4/99 |
E501 |
SHCG |
01 |
(Now Unassigned) | ||
E501 |
SHCG |
02 |
(Now Unassigned) | ||
E503 |
CCPJ |
01 |
PCCP Joints | Type D-1 Contraction Joint | 3/1/05 |
E503 |
CCPJ |
02 |
PCCP Joints | Longitudinal Joint | 9/1/99 |
E503 |
CCPJ |
03 |
PCCP Joints | Longitudinal Joint | 3/1/04 |
E503 |
CCPJ |
04 |
PCCP Joints | Longitudinal Keyway Joint | 9/1/99 |
E503 |
CCPJ |
05 |
PCCP Joints | Transverse Construction Joint | 9/1/99 |
E503 |
CCPJ |
06 |
PCCP Joints | Transverse Joint Seals | 3/1/05 |
E503 |
CCPJ |
07 |
PCCP Joints | Longitudinal Construction Joint | 9/1/99 |
E503 |
CCPJ |
08 |
PCCP Joints | Longitudinal Construction Joint | 9/1/99 |
E506 |
CCPP |
01 |
PCCP Patching | Concrete Pavement Patch Details | 9/1/99 |
E507 |
RLTC |
01 |
Retrofit Load Transfer of PCCP | Retrofit Dowel Slot & Slot Details | 9/1/04 |
E507 |
RLTC |
02 |
Retrofit Load Transfer of PCCP | Retrofit Dowel Slot & Bar Location | 9/1/04 |