Language Translation
  Close Menu
Active Design Memos

Active Design Memos

Active Design Memos

Design Memos are typically published the second week of each month. Unless otherwise stated, associated revisions to the Indiana Design Manual (IDM) are published concurrently.

Memos remain active for one year then are moved to the Archived Design Memos page.

Superseded memos are archived immediately. Memos that include guidance that has not been incorporated into the IDM or other INDOT publication may remain active longer. Memos that are integral to applying a recurring special provision (RSP) or recurring plan detail (RPD) may remain active longer.

The practice of distinguishing policy memos from techncial advisories was discontinued January 2018.

This Page Last Updated 4/8/25

Memo Number Memo Date Subject Affected IDM Section Effective Date
25-12 4/16/25 Plan Revisions after Ready for Contracts 14‐1.02(04), 14‐1.02(06), 14‐1.02(07), (new) Figures 14‐1 O, 14‐1P, and 14‐1Q Immediately
25-11 4/16/25 Lean Concrete Base 17‐5.09(02), 603‐3.01, and 604‐2.03 Lettings on or after June 1, 2025
25-10 4/16/25 Void Reducing Asphalt Membrane for Asphalt Paving 602‐3.02 Lettings on or after September 1, 2025
25-09 4/16/25 Rewrite Chapter 43 Horizontal Alignment Chapter 43 (all sections), Chapter 48, Sections 48‐4.01(06), 48‐5.03(01), and 48‐5.03(02) Stage 2 Submittals on or after July 1, 2025
25-08 3/25/25 Life-Cycle Pavement Cost Analysis Update 602-2.0, 606-1.0, 606-2.05, 606-3.01, and 606-3.02 Lettings on or after September 1, 2025
25-07 2/13/25 Topsoil Management 17-4.10, 17-4.10(01) 17-4.10(02), 17-4.10(03), and 17-4.10(09) [New] Lettings on or after September 1, 2025
25-06 2/13/25 Prestressing Strands 406-10.0 and 406-12.02(03) Lettings on or after September 1, 2025
25-05 2/13/25 Reinforcing Bar Support Devices Figures 405-3D and 405-3E, Section 406-12.03(03),and Figure 406-12D [New] Lettings on or after September 1, 2025
25-04 2/13/25 NEXT Beams 406-12.02(01), Figures 406-14BB and406-14DD Lettings on or after September 1, 2025
25-03 1/21/25 Maintenance of Traffic Updates 503-2.05(01), 503-6.01, 503-7.01(04), 503-7.03, and 503-7.05 Lettings on or after September 1, 2025
25-02 1/21/25 Various Traffic Design Updates 502-1.01(06), 502-1.01(14), 502-1.02(09)[New], 502-3.06(07)[New], 502-4.03(05), 502-4.07, and Figure 502-1E Lettings on or after September 1, 2025
25-01 1/21/25 IHCP Exception Requests NA As Noted
Memo Number Memo Date Subject Affected IDM Section Effective Date
24-17 12/04/24 Liquid Asphalt Sealant Figures 602‐3A thru 602-3D, 602-3G, 602-3H, and 602-3J Immediately
24-16 11/06/24 MSE Wall Shop Drawing Review Checklist N/A Immediately
24-15 11/06/24 FHWA-Indiana PS&E Checklist 14-2.01(13), 14-2.03(10), 14-2.04(09), 14-2.05(05), 14-2.06(03), 14-2.07(03), and 14-2.08(03) Lettings on or after September 1, 2025
24-14 09/11/24 Pavement Ledge Width 405‐3F, 406‐16E, 406‐16L, 406‐16S, 409‐2D,and 409‐3D Lettings on or after September 1, 2025
24-13 09/11/24 Integral End Bent Details 409‐2.04(03),409‐2C(deleted) and 409‐2D Stage 3 submittals on or after March 1, 2025
24-12 Rev. 09/11/24 rev. 10/11/24 Semi‐Integral End Bent Details 409‐3.03,409‐3A and 409‐3B Stage 3 submittals on or after March 1, 2025
24-11 08/14/24 Preliminary Geometrics Review for Non-Conventional Intersections Section 14-2.01(03) As Noted
24-10 08/14/24 Pavement Patching Tables N/A As Noted
24-09 08/14/24 Buy America Certification Procedures for Utilities and Railroads Sections 104-2.02, 104-2.02(01) (new), 104-2.02(02) (new), Sections 105-1.04(03) and 105-1.04(04) Immediately
24-08 06/19/24 MOT on High-Volume Interstate Highways N/A Immediately
24-07 05/14/24 2024 INDOT Standard Drawings N/A Lettings on or after September 1, 2024
24-06 04/11/24 IHCP Contract Documents N/A As noted
24-05 04/11/24 PROWAG Elements Phased Implementation N/A Lettings on or after July 1, 2028
24-04 04/11/24 Pavement Design Process IDM Chapter 601 sections 601-4.0, Figures 601-4A thru -4F (deleted), 601-5.0, 601-5.01, 601-5.01(01), 601-5.01(02), 601-5.01(03), 601-5.01(04), Figure 601-5A, 601-6.0 Chapter 602 Fig 602-3EE Chapter 604 sections 604-1.01, 604-1.04, 604-1.05, 604-2.01, 604-2.02, 604-2.03, 604-2.08, Figures 604-2A thru -2F(added) Editable Document 601-6.0.2, Pavement Design Request form Immediately
24-03 02/12/24 Waterproofing Membrane and Partial Coating Limits IDM Sections 407-2.01(03), Figure 407-2A (deleted) Contracts Letting on or after September 1, 2024
24-02 01/09/24 Lightweight Concrete, Threaded Tie Bar Assemblies, and Concrete Cover IDM Sections 405-2.07(06) (new), 405-3.13 (deleted), and Figures 405-1A, 405-2C, 405-2AA, 405-3E As Noted
24-01 01/09/24 Subgrade Treatment IDM Chapter 603-4.0 Lettings on or after June 1, 2024
Memo Number Memo Date Subject Affected IDM Section Effective Date
23-21 12/08/23 HMA Pavement PG Binder IDM Chapter 601-2.0, 601-3.0, 601-5.01(04), and Fig. 601-5C
IDM Chapter 602-3.02, 602-3.02(01) thru -3.02(03)
IDM Chapter 607-1.0, 607-1.01
Lettings on or after September 1, 2024
23-20 11/15/23 Extended Pile Bents and Wall Pier on Single Row of Piles IDM Chapter 409-6.01(01), 409-6.03(05), 409-6.04(01), 409-6.04(02), 409-6.04(04), Figures 409-6B and 409-6C Stage 1 submittals on or after January 1, 2024
23-19 11/15/23 Joint Probability Analysis IDM Figure 203-2G Hydraulic Design submitted or completed on or after November 15, 2023
23-18 Rev. 11/15/23 rev. 3/12/24 Survey Requirements IDM Chapter 26 Design Survey on or after November 15, 2023
23-17 10/16/23 Placing and Terminating Temporary Traffic Barrier N/A Lettings on or after December 1, 2023
23-16 10/16/23 Public Rights-of-Way Accessibility Guidelines (PROWAG) N/A Lettings on or after July 1, 2024
23-11 09/14/23 Payment for Elastomeric Bearing Assemblies IDM Chapter 409-7.03(01) Lettings on or after June 1, 2024
23-10 08/14/23 Bridge Painting IDM Chapter 17-5.11 As Noted
23-08 07/11/23 Railroad Flagging IDM Chapter 105-3.03 Contracts letting on or after January 1, 2024
23-07 07/11/23 Guardrail End Treatments N/A Lettings on or after October 1, 2023
23-03 05/12/23 Stormwater Management IDM Chapter 14-2.01(07), 14-2.03(03), 14-2.03(10), 14-2.04(06), 14-2.05(03) , 14-2.05(05), 17-6.02, 17-6.03, 17-6.04 and 205-4.0 Lettings on or after September 1st, 2023
23-02 05/12/23 Void Reducing Asphalt Membrane for Asphalt Paving IDM Chapter 602-3.02 For lettings on or after May 1, 2024
Memo Number Memo Date Subject Affected IDM Section Effective Date
22-22 11/10/22 Post-construction Stormwater Management IDM Chapter 204 As Noted
22-17 09/13/22 AASHTO LRFD Bridge Design Specifications N/A Stage 2 submittals on or after March 1, 2023
22-05 04/20/22 Concrete Median Barrier for Interstate Routes N/A Immediately
22-01 01/06/22 Stage 2 Documents for Publication IDM Chapter 14, Sections 14-2.01(07), 14-2.04(06), 14-2.05(03), 14-2.06(02),
14-2.07(02), and 14-2.08(02)
Stage 2 Plans on or after January 06, 2022
Memo Number Memo Date Subject Affected IDM Section Effective Date
21-18 Rev. 09/09/21 rev. 02/09/22 rev. 07/11/2023 Scour Requirements for Bridge Preventive Maintenance Projects IDM Chapter 14, Sections 14-2.05, 412-2.0, and Figure 412-2C(Rev.) Stage 1 Submittals on or after October 1, 2021
21-04 03/11/21 Full Depth Reclamation (FDR) Projects and Rule 5 Permits N/A Immediately
Memo Number Memo Date Subject Affected IDM Section Effective Date
20-14 08/06/20 Preventative Maintenance and 3R Design Criteria for Freeway and Interstate Resurfacing Projects
Attachment: August 2020 Q&A for Design Memos 20-13 & 20-14
N/A Immediately
Memo Number Memo Date Subject Affected IDM Section Effective Date
18-26 11/08/18 Pedestrian Pushbutton and ADA Plan Details 51-1.06(03) Stage 3 Submittal on or after March 1, 2019
18-20 08/06/18 Bridge Aesthetics Policy N/A Immediately
18-05 03/05/18 Plan Note for TAC Approved ADA Inquiries N/A Stage 3 Submissions on or after April 2, 2018
Memo Number Memo Date Subject Affected IDM Section Effective Date
17-20 09/05/17 Complex Bridge Design Requirements N/A

Immediately

17-17 08/07/17 Manual for Assessing Safety Hardware (MASH) and New
W-beam Guardrail and Guardrail End Treatment Standards
Attachment: Pay Items Associated with MGS W-Beam Guardrail and Related Systems
N/A NHS Routes: Letting on or after January 1, 2018
Non-NHS Routes: Letting on or after July 1, 2018
17-10 05/11/17 Manual for Assessing Safety Hardware (MASH) and New W-beam Guardrail and Guardrail End Treatment Standards
Attachment: Midwest Guardrail System Assembly Figures, AASHTO/FHWA Joint Implementation Agreegement for MASH Memo
N/A

NHS Routes: Letting on or after January 1, 2018
Non-NHS Routes: Letting on or after July 1, 2018

17-04 03/16/17 Culvert Asset ID Number
Attachment: Culvert Asset ID Numbering System
N/A Stage 3 on or after May 2017
17-02 02/02/17 Rural Interstate Shoulder Width N/A Immediately
Memo Number Memo Date Subject Affected IDM Section Effective Date
16-35 11/21/16 Undistributed Quantities N/A Immediately
16-10 03/16/16 NEPA Compliance and Waterway Permitting for Bundled Projects
Attachment: INDOT Environmental Memo

N/A Immediately
16-01 01/05/16 Structure Number in ERMS, SPMS, and on Plans
Attachment: Example

N/A Immediately
Memo Number Memo Date Subject Affected IDM Section Effective Date
13-09 04/12/13 Small Structure Replacement, Guardrail Runout Length
Attachment: RDG Table 5-10(b)
Chapters 49 & 55 Preliminary Field Check on or after June 1, 2013 and as noted
Memo Number Memo Date Subject Affected IDM Section Effective Date
11-09 04/05/11 High-Tension Cable-Barrier System (CBS)
Attachment: RSP 627-R-546 Attachment: RPD 627-R-546d
49-5.01(04) Lettings on or after May 11, 2011
Memo Number Memo Date Subject Affected IDM Section Effective Date
05-34 11/9/05 Concrete Railings & Moment Slabs at Mechanically Stabilized Earth (MSE) Wall Systems
Attachment: 706-R-504 RSP & RPD
49-4.01(05) 02/15/10
Memo Number Memo Date Subject Affected IDM Section Effective Date
03-07 07/02/03 Policy for Context Sensitive Solution N/A Immediately
Memo Number Memo Date Subject Affected IDM Section Effective Date
01-14 12/10/01 Water Main & Sanitary Sewer Construction in Contracts N/A Immediately

INDOT Events

More News & Events

Top FAQs