Active Design Memos

Active Design Memos

Active Design Memos

Updated 2/9/26

  • The design memos are generally published during the second week of each month. Unless stated otherwise, any revisions to the Indiana Design Manual (IDM) will be published at the same time.

  • Memos remain active for one year before being moved to the Archived Design Memos page. Superseded memos are archived immediately. Memos that contain guidance not yet included in the IDM or other INDOT publications may remain active for a longer period. Additionally, memos that are integral to applying a recurring special provision (RSP) or recurring plan detail (RPD) may also be kept active longer.

  • The practice of distinguishing between policy memos and technical advisories was discontinued in January 2018.

Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
26-06 2/9/26 Law Enforcement Officer RSP Fig. 14-1C Lettings on or after May 1, 2026
26-05 2/9/26 Prestressed Beam Imposed Deformations 406-12.06 Stage 3 on or after March 1, 2026
26-04 2/9/26 Prestressed Beam Camber and Fillet Loads 406-12.04(03),
Fig. 406-12E[New], Fig. 406-12F[New]
Stage 3 on or after March 1, 2026
26-03 1/14/26 Pipe Backfill Calculator (Updated Program) 17-3.02, 17-3.03,
Fig. 17-3A
Immediately
26-02 1/14/26 Mobilization and Demobiliation for Seeding N/A N/A
26-01 1/14/26 Post-Construction Stormwater Management N/A As Noted
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
25-22 12/10/25 Special Partial Coating System Fig. 17-5L Lettings on or after June 1, 2026
25-21 12/10/25 Plastic Pipe Material Types
Attachments:
Pipe Material Table XLS
Pipe Material Table PDF
Pipe Material Table DGN
N/A Lettings on or after June 1, 2026
25-20 12/10/25 Construction Signs N/A Lettings on or after March 1, 2026
25-19 9/10/25 Traffic Signal Preemption and Light Trespass 502-3.03(03), 502-4.06(03) Lettings on or after December 1, 2025
25-18 8/13/25 Update to IHCP Templates N/A Immediately
25-17 8/13/25 Permanent Seeding Fertilizer Rate 17-4.10(01), 17-4.10(03) Lettings on or after December 1, 2025
25-16 8/13/25 Pavement Type Selection Process 601-5.01(03), 602-2.0, 606-1.0 Immediately
25-15 7/15/25 Bridge Deck Overlay 17-5.12[New], 412-3.02,
Fig. 17-5M[New], Fig. 412-3C
Lettings on or after September 1, 2025
25-14 5/7/25 CAD Workspace Updates N/A Stage 3 on or after June 1, 2025
25-13 5/7/25 2025 INDOT Standard Drawings N/A Lettings on or after September 1, 2025
25-12 Rev. 4/16/25
rev. 5/7/25
Plan Revisions after Ready for Contracts 14‐1.02(04), 14‐1.02(06), 14‐1.02(07),
Fig. 14‐1O[New], Fig. 14‐1P[New], Fig. 14‐1Q[New]
Immediately
25-11 4/16/25 Lean Concrete Base 17‐5.09(02), 603‐3.01, 604‐2.03 Lettings on or after June 1, 2025
25-10 4/16/25 Void Reducing Asphalt Membrane for Asphalt Paving 602‐3.02 Lettings on or after September 1, 2025
25-09 4/16/25 Rewrite Chapter 43 Horizontal Alignment Chapter 43 (all sections), 48‐4.01(06),
48‐5.03(01), 48‐5.03(02)
Stage 2 on or after July 1, 2025
25-08 3/25/25 Life-Cycle Pavement Cost Analysis Update 602-2.0, 606-1.0, 606-2.05,
606-3.01, 606-3.02
Lettings on or after September 1, 2025
25-07 2/13/25 Topsoil Management 17-4.10, 17-4.10(01), 17-4.10(02),
17-4.10(03), 17-4.10(09)[New]
Lettings on or after September 1, 2025
25-06 2/13/25 Prestressing Strands 406-10.0, 406-12.02(03) Lettings on or after September 1, 2025
25-05 2/13/25 Reinforcing Bar Support Devices 406-12.03(03),
Fig. 405-3D, Fig. 405-3E, Fig. 406-12D[New]
Lettings on or after September 1, 2025
25-04 2/13/25 NEXT Beams 406-12.02(01),
Fig. 406-14BB, Fig. 406-14DD
Lettings on or after September 1, 2025
25-03 1/21/25 Maintenance of Traffic Updates 503-2.05(01), 503-6.01, 503-7.01(04),
503-7.03, 503-7.05
Lettings on or after September 1, 2025
25-02 1/21/25 Various Traffic Design Updates 502-1.01(06), 502-1.01(14), 502-1.02(09)[New],
502-3.06(07)[New], 502-4.03(05), 502-4.07,
Fig. 502-1E
Lettings on or after September 1, 2025
25-01 1/21/25 IHCP Exception Requests N/A As Noted
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
24-17 12/4/24 Liquid Asphalt Sealant Figs. 602‐3A thru 602-3D, 602-3G, 602-3H, 602-3J Immediately
24-16 11/6/24 MSE Wall Shop Drawing Review Checklist N/A Immediately
24-15 11/6/24 FHWA-Indiana PS&E Checklist 14-2.01(13), 14-2.03(10), 14-2.04(09), 14-2.05(05),
14-2.06(03), 14-2.07(03), 14-2.08(03)
Lettings on or after September 1, 2025
24-10 8/14/24 Pavement Patching Tables N/A As Noted
24-08 6/19/24 MOT on High-Volume Interstate Highways N/A Immediately
24-06 4/11/24 IHCP Contract Documents N/A As noted
24-05 4/11/24 PROWAG Elements Phased Implementation N/A Lettings on or after July 1, 2028
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
23-21 12/8/23 HMA Pavement PG Binder 601-2.0, 601-3.0, 601-5.01(04), Fig. 601-5C
602-3.02, 602-3.02(01) thru 3.02(03)
607-1.0, 607-1.01
Lettings on or after September 1, 2024
23-17 10/16/23 Placing and Terminating Temporary Traffic Barrier N/A Lettings on or after December 1, 2023
23-16 10/16/23 Public Rights-of-Way Accessibility Guidelines (PROWAG) N/A Lettings on or after July 1, 2024
23-10 8/14/23 Bridge Painting 17-5.11 As Noted
23-08 7/11/23 Railroad Flagging 105-3.03 Lettings on or after January 1, 2024
23-07 7/11/23 Guardrail End Treatments N/A Lettings on or after October 1, 2023
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
22-22 11/10/22 Post-construction Stormwater Management IDM Chapter 204 As Noted
22-17 9/13/22 AASHTO LRFD Bridge Design Specifications N/A Stage 2 on or after March 1, 2023
22-05 4/20/22 Concrete Median Barrier for Interstate Routes N/A Immediately
22-01 1/6/22 Stage 2 Documents for Publication 14-2.01(07), 14-2.04(06), 14-2.05(03),
14-2.06(02), 14-2.07(02), 14-2.08(02)
Stage 2 on or after January 6, 2022
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
21-18 Rev. 9/9/21
rev. 2/09/22
rev. 7/11/23
Scour Requirements for Bridge Preventive Maintenance Projects 14-2.05, 412-2.0, Fig. 412-2C[Rev] Stage 1 on or after October 1, 2021
21-04 3/11/21 Full Depth Reclamation (FDR) Projects and Rule 5 Permits N/A Immediately
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
20-14 8/6/20 Preventative Maintenance and 3R Design Criteria for Freeway and Interstate Resurfacing Projects
Attachment: August 2020 Q&A for Design Memos 20-13 & 20-14
N/A Immediately
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
18-26 11/8/18 Pedestrian Pushbutton and ADA Plan Details 51-1.06(03) Stage 3 on or after March 1, 2019
18-20 8/6/18 Bridge Aesthetics Policy N/A Immediately
18-05 3/5/18 Plan Note for TAC Approved ADA Inquiries N/A Stage 3 on or after April 2, 2018
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
17-20 9/5/17 Complex Bridge Design Requirements N/A Immediately
17-17 8/7/17 Manual for Assessing Safety Hardware (MASH) and New W-beam Guardrail and Guardrail End Treatment Standards
Attachment: Pay Items Associated with MGS W-Beam Guardrail and Related Systems
N/A NHS Routes: Letting on
or after January 1, 2018,
Non-NHS Routes: Letting on
or after July 1, 2018
17-10 5/11/17 Manual for Assessing Safety Hardware (MASH) and New W-beam Guardrail and Guardrail End Treatment Standards
Attachment 1: Midwest Guardrail System Assembly Figures
Attachment 2: AASHTO/FHWA Joint Implementation Agreement for MASH Memo
N/A NHS Routes: Letting on
or after January 1, 2018,
Non-NHS Routes: Letting on
or after July 1, 2018
17-04 Rev. 3/16/17 Rev. 11/13/17 Culvert Asset ID Number
Attachment: Culvert Asset ID Numbering System
N/A Stage 3 on or after May 2017
17-02 2/2/17 Rural Interstate Shoulder Width N/A Immediately
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
16-35 11/21/16 Undistributed Quantities N/A Immediately
16-10 3/16/16 NEPA Compliance and Waterway Permitting for Bundled Projects
Attachment: INDOT Environmental Memo
N/A Immediately
16-01 1/5/16 Structure Number in ERMS, SPMS, and on Plans
Attachment: Example
N/A Immediately
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
13-09 4/12/13 Small Structure Replacement, Guardrail Runout Length
Attachment: RDG Table 5-10(b)
Chapters 49 & 55 Preliminary Field Check on or after June 1, 2013 and as noted
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
11-09 4/5/11 High-Tension Cable-Barrier System (CBS)
Attachment: RSP 627-R-546
Attachment: RPD 627-R-546d
49-5.01(04) Lettings on or after May 11, 2011
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
05-34 11/9/05 Concrete Railings & Moment Slabs at Mechanically Stabilized Earth (MSE) Wall Systems
Attachment: 706-R-504 RSP & RPD
49-4.01(05) February 15, 2010
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
03-07 7/2/03 Policy for Context Sensitive Solution N/A Immediately
Memo Number Memo Date Subject Affected IDM Section, Figure, or Reference Effective Date
01-14 12/10/01 Water Main & Sanitary Sewer Construction in Contracts N/A Immediately