Article
Standard Drawings |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Section 100 - General Provisions
Section 200 - Earthwork
Section 300 - Aggregate Pavement and Bases
Download all Standard Drawings for Sections 100, 200, & 300 (pdf 3.0 MB)
Last Updated: 4/24/17
Drawing Series & Numbers |
Drawing Title | Eff. Date |
E 105-RCBL
E 105-RBCL-01 |
Road and Bridge Contract Limits
Method for Determining Quantities within Structure Limits (eff. 09/01/00) |
09/01/00 |
E 205-TECD
E 205-TECD-01 |
Temporary Erosion Control Ditch
Temporary Check Dam, Revetment Rip Rap (rev. 09/04/12) |
09/04/12 Revision Notes |
E 205-TECI
E 205-TECI-01 |
Temporary Erosion Control Inlet
Temporary Ditch Inlet Protection, Gravel Ring (eff. 03/01/02) |
09/04/12 Revision Notes |
E 205-TECP
E 205-TECP-01
|
Temporary Erosion Control Perimeter
Temporary Erosion Control, Perimeter Construction Entrance (rev. 09/03/13, editorial only) |
09/03/13 Revision Notes |
E 205-TECS
E 205-TECS-01 |
Temporary Erosion Control Slope
Temporary Interceptor Ditch (eff. 03/01/02) |
09/04/12 Revision Notes |
E 211-BFIL
E 211-BFIL-01 |
Backfill
Part Plan for Flared Wings (eff. 03/03/03) |
09/04/12 Revision Notes |
E 303-STRW
E 303-STRW-01 |
Shoulder Treatment Resurfacing Work
Shoulder Treatment for Resurfacing Work (eff. 09/04/07) |
09/04/07 |
E 306-TMPT
E 306-TMPT-01 |
Transition Milling Pavement
HMA-Pavement Wedging & Transition Milling (eff. 09/04/07) |
09/04/07 |