Article
Standard Drawings, Sept 2014, English Drawings
Standard Drawings |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Revised & New Drawings Effective 09/02/14 |
Effective for Lettings on or after September 2, 2014 |
English Standard Drawings--Revised and New |
Last Updated: 3/4/19
Drawing Series & Numbers |
Drawing Title | Eff. Date |
E 601-TWGT
E 601-TWGT-01 |
W-Beam to Thrie-Beam Guardrail Transition Type WGT
W-Beam to Thrie-Beam Guardrail Transition (rev. 09/02/14, editorial only) |
09/02/14 Revision Notes |
E 605-CCSJ
E 605-CCSJ-01 |
Concrete Curbs & Sawed Joints
Concrete and Asphalt Curbs & Sawed Joints (rev. 09/02/14, editorial only) |
09/02/14 Revision Notes |
E 609-RCBA
E 609-RCBA-01 |
Reinforced Concrete Bridge Approach
Reinforced Concrete Bridge Approach, Square (new 09/02/14) |
09/02/14 Revision Notes |
E 610-MBAP
E 610-MBAP-01 |
Mailbox Approaches
Mailbox Approaches High Speed Roadway (rev. 09/02/14, editorial only) |
09/02/14 Revision Notes |
E 706-TTTX
E 706-TTTX-01 |
Transition Thrie to TX (prev. E 706-TPBT)
Concrete Bridge Railing Transition, TTX Plan & Elevation (rev. 09/02/14) |
09/02/14 Revision Notes |
E 802-SCLS
E 802-SCLS-01 |
Sign Cantilever Structure
(rev. by RPD 802-T-199d, eff. 12/01/13)
Drawing Index (new 09/03/13) |
09/02/14 Revision Notes |
E 802-SCSB
E 802-SCSB-01 |
Sign Cantilever Structure Butterfly
(new eff. 12/01/13, see RPD 802-T-197d)
Drawing Index (new 09/02/14) |
09/02/14 Revision Notes |
E 802-SNDH
E 802-SNDH-01 |
Sign Placement Divided Highway Intersection
Median Width < 30 ft (new 09/02/14) |
09/02/14 Revision Notes |
E 802-SNGP
E 802-SNGP-01 |
Sign Placement
Sign Placement (rev. 09/03/13) |
09/02/14 Revision Notes |
E 805-TSCS
E 805-TSCS-01 |
Traffic Signal Cantilever Structure (revised, see RPD 805-T-200d, eff. 12/01/13)
Drawing Index (new 09/03/13) |
09/02/14 Revision Notes |