Indiana Department of Transportation
INDOT > Doing Business with INDOT > Standards & Specifications > Standard Drawings > Sept 2007 > English Sections 400 & 500 English Sections 400 & 500
Standard Drawings |
English Metric |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Revised & New Drawings Effective 09/01/07 |
Effective for Lettings on or after September 1, 2007 |
Section 400 - Asphalt Pavement Section 500 - Rigid Pavement |
Last Updated: 5/8/13 |
Ref. |
Title | Description | Date |
E 400-PTRN-01 | Pavement Transitions | Pavement Type Transition | 9/1/99 |
E 401-REBS-01 | Ramp Entrance with Bituminous Shoulder | Ramp Entrance Terminal HMA Shoulder | 9/1/99 |
E 401-REBS-02 | Ramp Entrance with Bituminous Shoulder | Ramp Exit Terminal HMA Shoulder | 1/4/99 |
E 401-REBS-03 | Ramp Entrance with Bituminous Shoulder | Ramp Cross Sections HMA Shoulder | 9/1/00 |
E 401-REBS-04 | Ramp Entrance with Bituminous Shoulder | Ramp Terminal Tables | 6/3/96 |
E 500-PTRN-01 | Pavement Transitions | Pavement Type Transition | 9/1/99 |
E 500-PTRN-02 | Pavement Transitions | Pavement Type Transition | 1/3/00 |
E 500-PTRN-03 | Pavement Transitions | Pavement Type Transition | 9/1/99 |
E 500-PTRN-04 | Pavement Transitions | Pavement Type Transition | 9/1/99 |
E 501-RECS-01 | Ramp Entrance Concrete Shoulder | Ramp Entrance Terminal Concrete Shoulder | 9/1/00 |
E 501-RECS-02 | Ramp Entrance Concrete Shoulder | Ramp Exit Terminal Concrete Shoulder | 9/1/99 |
E 501-RECS-03 | Ramp Entrance Concrete Shoulder | Ramp Cross Sections Concrete Shoulders | 1/4/99 |
E 503-CCPJ-01 | PCCP Joints | Type D-1 Contraction Joint | 9/4/07 |
E 503-CCPJ-02 | PCCP Joints | Longitudinal Joint | 9/1/99 |
E 503-CCPJ-03 | PCCP Joints | Longitudinal Joint | 3/1/04 |
E 503-CCPJ-04 | PCCP Joints | Longitudinal Keyway Joint | 9/1/99 |
E 503-CCPJ-05 | PCCP Joints | Transverse Construction Joint | 9/1/99 |
E 503-CCPJ-06 | PCCP Joints | Transverse Joint Seals | 3/1/05 |
E 503-CCPJ-07 | PCCP Joints | Longitudinal Construction Joint | 9/1/99 |
E 503-CCPJ-08 | PCCP Joints | Longitudinal Construction Joint | 9/1/99 |
E 506-CCPP-01 | PCCP Patching | Concrete Pavement Patch Details | 3/1/06 |
E 507-RLTC-01 | Retrofit Load Transfer of PCCP | Retrofit Dowel Slot & Slot Details | 9/1/04 |
E 507-RLTC-02 | Retrofit Load Transfer of PCCP | Retrofit Dowel Slot & Bar Location | 9/1/04 |