Doing Business with INDOT — Standards and Specifications
Effective for Lettings on or after September 1, 2006
English Standard Drawings
Section 100 – General Provisions
Section 200 – Earthwork
Section 300 – Bases
English Standard Drawings
Section 100 – General Provisions
Section 200 – Earthwork
Section 300 – Bases
Ref. |
Code |
Page |
Title |
Description |
Date |
E105 |
RBCL |
01 |
Road and Bridge Contract Limits | Road & Bridge Contract Limits | 9/1/00 |
E205 |
TECD |
01 |
Temporary Erosion Control Ditch | Temporary Check Dam, Revetment Rip Rap | 3/3/03 |
E205 |
TECD |
02 |
Temporary Erosion Control Ditch | Temporary Check Dam, Straw Bales | 3/1/05 |
E205 |
TECD |
04 |
Temporary Erosion Control Ditch | Temporary Sediment Trap | 3/1/04 |
E205 |
TECI |
01 |
Temporary Erosion Control Inlet | Temporary Ditch Inlet Protection, Aggregate Ring | 3/1/02 |
E205 |
TECI |
02 |
Temporary Erosion Control Inlet | Temporary Ditch Inlet Protection, Geotextile Box | 3/1/02 |
E205 |
TECI |
03 |
Temporary Erosion Control Inlet | Temporary Ditch Inlet Protection, Slotted Barrel | 3/1/02 |
E205 |
TECP |
02 |
Temporary Erosion Control Perimeter | Temporary Silt Fence | 3/1/02 |
E205 |
TECS |
01 |
Temporary Erosion Control Slope | Temporary Interceptor Ditch | 3/1/02 |
E205 |
TECS |
02 |
Temporary Erosion Control Slope | Temporary Slope Drain | 9/4/01 |
E205 |
TECS |
03 |
Temporary Erosion Control Slope | Temporary Slope Drain | 9/4/01 |
E211 |
BFIL |
01 |
Bridge Fill | Part Plan for Flared Wings | 3/3/03 |
E211 |
BFIL |
02 |
Bridge Fill | Flared Wings Typical Cross Section | 9/30/94 |
E211 |
BFIL |
03 |
Bridge Fill | Backfill Placement at Interior Support | 9/2/03 |
E211 |
BFIL |
04 |
Bridge Fill | Backfill Placement at End Bent, Beam Structure | 9/2/03 |
E211 |
BFIL |
05 |
Bridge Fill | Backfill Placement at End Bent, Slab Structure | 9/1/04 |
E303 |
STRW |
01 |
Shoulder Treatment Resurfacing Work | Shoulder Treatment for Resurfacing Work | 4/3/95 |