Language Translation
  Close Menu
INDOT: Metric Sections 400 & 500 - Effective September 1, 2011

Indiana Department of Transportation

INDOT >  Doing Business with INDOT >  Standards & Specifications >  Standard Drawings >  Sept 2011 >  Metric Sections 400 & 500 Metric Sections 400 & 500

Standard
Drawings
English
Metric
Sections
100 - 300
Sections
400, 500
Section
600
Section
700
Section
800
Revised & New Drawings
Effective 09/01/11

Effective for Lettings on or after September 1, 2011
 
Section 400 - Asphalt Pavement
Section 500 - Rigid Pavement

Last Updated: 5/8/13

Ref.
Title Description
Date
400-PTRN-01 Pavement Type Transition Existing PCCP to New HMA Pavement
9/1/99
401-REBS-01 Ramp Entrance Terminal HMA Shoulder Entrance Ramp with Asphalt Shoulder
9/2/08
401-REBS-02 Ramp Exit Terminal HMA Shoulder Exit Ramp with Asphalt Shoulder
1/4/99
401-REBS-03 Ramp Cross Sections HMA Shoulder Exit Ramp with Asphalt Shoulder
9/1/00
401-REBS-04 Ramp Terminal Tables Acceleration-Lane Lengths
6/3/96
402-NVUF-01 HMA Nonmotorized-Vehicle-Use Facility Pavement Section Nonmotorized-Vehicle-Use Facility
9/1/10
402-NVUF-02 HMA Nonmotorized-Vehicle-Use Facility Pavement Section on Abandoned-Railroad Corridor Nonmotorized-Vehicle-Use Facility
9/1/10
500-PTRN-01 Pavement Type Transition Existing HMA Pavement to New PCCP
9/1/99
500-PTRN-02 Pavement Type Transition Existing Composite Pavement to New PCCP
1/3/00
500-PTRN-03 Pavement Type Transition Existing Composite Pavement to New Thicker PCCP
9/1/99
500-PTRN-04 Pavement Type Transition Existing PCCP to New PCCP
9/1/99
501-RECS-01 Ramp Entrance Terminal Concrete Shoulder Entrance Ramp with Concrete Shoulder
9/2/08
501-RECS-02 Ramp Exit Terminal Concrete Shoulder Exit Ramp with Concrete Shoulder
9/2/08
501-RECS-03 Ramp Cross Sections Concrete Shoulders Exit Ramp with Concrete Shoulder
1/4/99
502-NVUF-01 PCCP Nonmotorized-Vehicle-Use Facility Pavement Section Nonmotorized-Vehicle-Use Facility
9/1/10
503-CCPJ-01 Type D-1 Contraction Joint Longitudinal Section Through PCCP
9/4/07
503-CCPJ-02 Longitudinal Joint Cement Concrete Pavement Joints
09/01/11
503-CCPJ-03 Longitudinal Joint Sawed-Longitudinal-Joint Sealing Options
3/1/04
503-CCPJ-04 Longitudinal Keyway Joint Plans and Elevations
9/1/99
503-CCPJ-05 Transverse Construction Joint Retrofit Tie-Bar Embedment
9/1/99
503-CCPJ-06 Transverse Joint Seals Type D-1 Sawed Construction Joint
3/1/05
503-CCPJ-07 Longitudinal Construction Joint Tie-Bars Placement
9/1/99
503-CCPJ-08 Longitudinal Construction Joint Retrofit Tie-Bar Embedment
09/01/11
506-CCPP-01 Concrete Pavement Patch Details PCCP Patching
09/01/11
507-RLTC-01 Retrofit Dowel Slot & Bar Details Dowel Slot
9/1/04
507-RLTC-02 Retrofit Dowel Slot & Bar Location Retrofit Load Transfer
9/1/04

INDOT Events

More News & Events

Top FAQs