INDOT: Metric Sections 400-500 - Effective March 1, 2005

INDOT >  Doing Business with INDOT >  Standards and Specifications >  Standard Drawings >  March 2005 >  Metric Sections 400-500 Metric Sections 400-500

Standard
Drawings
English
Metric
Sections
100 - 300
Sections
400, 500
Section
600
Section
700
Section
800

Effective for Lettings on or after March 1, 2005
 
Section 400 - Asphalt Pavement
Section 500 - Rigid Pavement

Last Updated: 5/26/11

Spec
Ref.
Code
Page
Title Description
Effective
Date
400
PTRN
01
Pavement Transitions Pavement Type Transition
9/1/99
401
REBS
01
Ramp Entrance with Bituminous
Shoulder
Ramp Entrance Terminal HMA Shoulder
9/1/99
401
REBS
02
Ramp Entrance with Bituminous
Shoulder
Ramp Exit Terminal HMA Shoulder
1/4/99
401
REBS
03
Ramp Entrance with Bituminous
Shoulder
Ramp Cross Sections HMA Shoulder
9/1/00
401
REBS
04
Ramp Entrance with Bituminous
Shoulder
Ramp Terminal Tables
6/3/96
402
SHCG
01
(Now Unassigned)  
 
402
SHCG
02
(Now Unassigned)  
 
402
TMPT
01
Pavement Treatment Termination Termination of Mainline Pavement Overlay
3/1/05
500
PTRN
01
Pavement Transitions Pavement Type Transition
9/1/99
500
PTRN
02
Pavement Transitions Pavement Type Transition
1/3/00
500
PTRN
03
Pavement Transitions Pavement Type Transition
9/1/99
500
PTRN
04
Pavement Transitions Pavement Type Transition
9/1/99
500
SHCG
01
(Now Unassigned)  
 
500
SHCG
02
(Now Unassigned)  
 
501
CCPJ
01
(Now Unassigned  
 
501
CCPJ
02
(Now Unassigned)  
 
501
CCPJ
03
(Now Unassigned  
 
501
CCPJ
04
(Now Unassigned)  
 
501
CCPJ
05
(Now Unassigned)  
 
501
CCPJ
06
(Now Unassigned)  
 
501
CCPJ
07
(Now Unassigned)  
 
501
CCPJ
08
(Now Unassigned)  
 
501
CCPJ
09
(Now Unassigned)  
 
501
CCPJ
10
(Now Unassigned)  
 
501
CCPJ
11
(Now Unassigned)  
 
501
RECS
01
Ramp Entrance Concrete Shoulder Ramp Entrance Terminal Concrete Shoulder
9/1/00
501
RECS
02
Ramp Entrance Concrete Shoulder Ramp Exit Terminal Concrete Shoulder
9/1/99
501
RECS
03
Ramp Entrance Concrete Shoulder Ramp Cross Sections Concrete Shoulders
1/4/99
501
SHCG
01
(Now Unassigned)  
 
501
SHCG
02
(Now Unassigned)  
 
503
CCPJ
01
PCCP Joints Type D-1 Contraction Joint
3/1/05
503
CCPJ
02
PCCP Joints Longitudinal Joint
9/1/99
503
CCPJ
03
PCCP Joints Longitudinal Joint
3/1/04
503
CCPJ
04
PCCP Joints Longitudinal Keyway Joint
9/1/99
503
CCPJ
05
PCCP Joints Transverse Construction Joint
9/1/99
503
CCPJ
06
PCCP Joints Transverse Joint Seals
3/1/05
503
CCPJ
07
PCCP Joints Longitudinal Construction Joint
9/1/99
503
CCPJ
08
PCCP Joints Longitudinal Construction Joint
9/1/99
506
CCPP
01
PCCP Patching Concrete Pavement Patch Details
9/1/99
507
RLTC
01
Retrofit Load Transfer of PCCP Retrofit Dowel Slot & Slot Details
9/1/04
507
RLTC
02
Retrofit Load Transfer of PCCP Retrofit Dowel Slot & Bar Location
9/1/04

INDOT Events

More News & Events