FRONTIER SCHOOL CORPORATION
To view the full report for a bus inspection, click on the PDF icon on the right.

Go Back New Search

Bus Inspections

Bus # Inspection Date/Time Inspection Valid Until Inspection Type Inspection Status Violations Inspected By Reports
8 5/31/2024 10:11:01 AM 9/30/2025 12:00:00 AM Annual Approved None Nate King Export Inspection Report
8 3/24/2023 10:42:52 AM 9/30/2024 12:00:00 AM Registration Approved None Nate King Export Inspection Report
8 5/20/2021 9:50:01 AM 9/30/2022 12:00:00 AM Annual Approved None Nate King Export Inspection Report
8 6/24/2020 10:19:01 AM 9/30/2021 12:00:00 AM Annual Approved None Nate King Export Inspection Report
8 7/9/2019 11:01:01 AM 9/30/2020 12:00:00 AM Re-Inspection Approved None Nate King Export Inspection Report
8 7/9/2019 11:01:00 AM 8/7/2019 11:01:00 AM Annual Ordered Repaired
  • Any shock absorber is leaking fluid
  • LED Lights have 25% to 49% of pixels inoperable.
  • Any hanger, clamp or bracket is missing, loose or broken
Nate King Export Inspection Report
8 6/5/2018 10:29:01 AM 9/30/2019 12:00:00 AM Re-Inspection Approved None Nate King Export Inspection Report
8 6/5/2018 10:29:00 AM 7/4/2018 10:29:00 AM Annual Ordered Repaired
  • There are any leaks from the differential, pinion seal, or either rear wheel seal
Nate King Export Inspection Report
8 1/4/2017 11:14:01 AM 9/30/2018 12:00:00 AM Re-Inspection Approved None Nate King Export Inspection Report
8 1/4/2017 10:42:00 AM Registration Out of Service
  • Stop arm does not function properly
Nate King Export Inspection Report
8 8/9/2016 10:35:01 AM 9/30/2017 12:00:00 AM Re-Inspection Approved None Nate King Export Inspection Report
8 6/30/2016 10:58:00 AM Annual Out of Service
  • Tires with visible bumps, bulges, or knots indicating partial failure or separation of the tire structure
  • Center/carrier bearing: any broken or loose center/carrier bearing bracket, bolts or mounting hardware, any center bearing bracket crack equaling fifty (50) percent or more of the original width, more than one half (1/2) inch vertical movement of the shaft in the center bearing carrier (rubber)
Nate King Export Inspection Report
8 7/8/2015 10:42:01 AM 9/30/2016 12:00:00 AM Annual Approved None Nate King Export Inspection Report
8 8/13/2014 2:37:01 PM 9/30/2015 12:00:00 AM Registration Approved None Nate King Export Inspection Report
8 5/22/2013 10:10:01 AM 9/30/2014 12:00:00 AM Annual Approved None Nate King Export Inspection Report
8 7/9/2012 8:53:00 AM 9/30/2013 12:00:00 AM Annual Approved None Joel Flores Export Inspection Report
Go Back New Search