Click on the links below to view maps of the U.S. 50 West project.
Preliminary Alternatives Recommended for Further NEPA Study
- Western Section (U.S. 31 to C.R. 575W) Preliminary Alternatives W1, W2 and W3
- Eastern Section (CR 575W to Jennings/Ripley County Line) Preliminary Alternatives A, B & D
Preliminary Alternatives Studied
- Western Section Preliminary Alternatives (U.S. 31 to C.R. 575W)
- Eastern Section Preliminary Alternatives (C.R. 575W to Jennings/Ripley County Line)
Preliminary Alternatives
From U.S. 31 to west side of North Vernon:
From west side of North Vernon to Jennings/Ripley County Line:
- Added Travel Lanes on Existing U.S. 50
- One-Way Pair Thru North Vernon
- Preliminary Bypass (New Terrain)
Study Area