HUNTINGTON CO. COMM. SCH. CORP
To view the full report for a bus inspection, click on the PDF icon on the right.

Go Back New Search

Bus Inspections

Bus # Inspection Date/Time Inspection Valid Until Inspection Type Inspection Status Violations Inspected By Reports
86 4/7/2025 10:53:01 AM 9/30/2026 12:00:00 AM Re-Inspection Approved None Steve Spallinger Export Inspection Report
86 4/7/2025 10:53:00 AM 5/6/2025 10:53:00 AM Annual Ordered Repaired
  • The first aid kit is not complete: One (1) package adhesive bandages; containing a total of sixteen (16) 1" x 3" bandages, 1 roll 1”x5yd, 1 blunt scissor, 6 3x3” gauze pads (sterile), 4 2”x5yd gauze stretch material (nonsterile), 3 oval eye pads (sterile), 2 triangular bandages, 1 instruction.
Steve Spallinger Export Inspection Report
86 4/5/2024 11:11:01 AM 9/30/2025 12:00:00 AM Annual Approved None Steve Spallinger Export Inspection Report
86 4/27/2023 11:40:01 AM 9/30/2024 12:00:00 AM Annual Approved None Steve Spallinger Export Inspection Report
86 4/27/2022 8:56:01 AM 9/30/2023 12:00:00 AM Annual Approved None Jamie Hotchkiss Export Inspection Report
86 4/27/2021 11:59:01 AM 9/30/2022 12:00:00 AM Annual Approved None Jamie Hotchkiss Export Inspection Report
86 5/4/2020 8:45:01 AM 9/30/2021 12:00:00 AM Annual Approved None Jamie Hotchkiss Export Inspection Report
Go Back New Search