HAMILTON SOUTHEASTERN SCHOOLS
To view the full report for a bus inspection, click on the PDF icon on the right.
Bus Inspections
Bus #
Inspection Date/Time
Inspection Valid Until
Inspection Type
Inspection Status
Violations
Inspected By
Reports
6A
3/26/2024 10:48:01 AM
9/30/2025 12:00:00 AM
Annual
Approved
None
Nathan Hampton
6A
4/10/2023 9:25:01 AM
9/30/2024 12:00:00 AM
Annual
Approved
None
Brandon Steffee
6A
4/19/2022 12:09:01 PM
9/30/2023 12:00:00 AM
Re-Inspection
Approved
None
Brandon Steffee
6A
4/19/2022 12:00:00 PM
Annual
Out of Service
The parking brake fails to hold the bus during the testing procedure. (Note – It is NOT a violation if the test cannot be done due to OEM design
If bus manufactured after 5-2-1994, positive door opening device is missing or fails to operate properly
Brandon Steffee
6A
4/8/2021 9:22:01 AM
9/30/2022 12:00:00 AM
Annual
Approved
None
Jeff Kastenschmidt
6A
6/26/2020 10:17:01 AM
9/30/2021 12:00:00 AM
Annual
Approved
None
Jeff Kastenschmidt
6A
3/11/2019 10:55:01 AM
9/30/2020 12:00:00 AM
Annual
Approved
None
John Pang
6A
6/29/2018 12:41:01 PM
9/30/2019 12:00:00 AM
Registration
Approved
None
Alex Willis
6A
3/20/2017 9:54:01 AM
9/30/2018 12:00:00 AM
Annual
Approved
None
Alex Willis
6A
3/16/2016 9:01:01 AM
9/30/2017 12:00:00 AM
Re-Inspection
Approved
None
John Pang
6A
3/11/2016 10:00:00 AM
4/9/2016 10:00:00 AM
Annual
Ordered Repaired
A dripping oil or fluid leak
Larry Gershanoff
6A
4/13/2015 9:08:01 AM
9/30/2016 12:00:00 AM
Annual
Approved
None
Edwin Davis
6A
4/10/2014 8:57:01 AM
9/30/2015 12:00:00 AM
Annual
Approved
None
Mike Adams
6A
4/26/2013 10:12:01 AM
9/30/2014 12:00:00 AM
Annual
Approved
None
Amy Gaul
6A
4/9/2012 11:14:00 AM
9/30/2013 12:00:00 AM
Annual
Approved
None
John Pang