Bus # |
Inspection Date/Time |
Inspection Valid Until |
Inspection Type |
Inspection Status |
Violations |
Inspected By |
Reports |
47 |
1/18/2024 10:48:01 AM |
9/30/2025 12:00:00 AM |
Annual |
Approved |
None
|
Jeff Stone |
|
47 |
1/11/2023 11:21:01 AM |
9/30/2024 12:00:00 AM |
Annual |
Approved |
None
|
Brandon Steffee |
|
47 |
1/18/2022 11:51:01 AM |
9/30/2023 12:00:00 AM |
Re-Inspection |
Approved |
None
|
Brandon Steffee |
|
47 |
1/18/2022 11:51:00 AM |
2/16/2022 11:51:00 AM |
Annual |
Ordered Repaired |
- If the words “EMERGENCY EXIT” does not appear on the top or bottom of the window or directly above each emergency exit window on the inside of the bus
|
Brandon Steffee |
|
47 |
1/15/2021 11:28:01 AM |
9/30/2022 12:00:00 AM |
Annual |
Approved |
None
|
Rob Hawkins |
|
47 |
7/24/2020 8:33:01 AM |
9/30/2021 12:00:00 AM |
Registration |
Approved |
None
|
Jeff Kastenschmidt |
|
47 |
1/15/2020 10:16:01 AM |
8/15/2020 10:16:01 AM |
Annual |
Approved |
None
|
Jeff Kastenschmidt |
|
47 |
6/18/2019 9:24:01 AM |
1/18/2020 9:24:01 AM |
Semi-Annual |
Approved |
None
|
Jeff Kastenschmidt |
|
47 |
1/7/2019 8:46:01 AM |
8/7/2019 8:46:01 AM |
Annual |
Approved |
None
|
John Pang |
|
47 |
6/29/2018 7:53:01 AM |
1/29/2019 7:53:01 AM |
Re-Inspection |
Approved |
None
|
John Pang |
|
47 |
1/11/2018 11:22:01 AM |
8/11/2018 11:22:01 AM |
Re-Inspection |
Approved |
None
|
Alex Willis |
|
47 |
1/10/2018 10:42:00 AM |
2/8/2018 10:42:00 AM |
Annual |
Ordered Repaired |
- Any exhaust leak can be felt with the bare hand six (6) inches from the leak in any direction (with the engine idling and the system unrestricted).
|
Jeff Kastenschmidt |
|
47 |
1/9/2017 9:07:01 AM |
9/30/2018 12:00:00 AM |
Annual |
Approved |
None
|
John Pang |
|
47 |
1/11/2016 10:44:01 AM |
9/30/2017 12:00:00 AM |
Annual |
Approved |
None
|
Alex Willis |
|
47 |
1/14/2015 11:20:01 AM |
9/30/2016 12:00:00 AM |
Annual |
Approved |
None
|
John Pang |
|
47 |
1/22/2014 10:19:01 AM |
9/30/2015 12:00:00 AM |
Annual |
Approved |
None
|
Mike Adams |
|
47 |
1/14/2013 10:00:01 AM |
9/30/2014 12:00:00 AM |
Annual |
Approved |
None
|
Chris Kath |
|
47 |
1/12/2012 9:28:00 AM |
9/30/2013 12:00:00 AM |
Re-Inspection |
Approved |
None
|
Chris Kath |
|
47 |
1/12/2012 9:27:00 AM |
2/10/2012 9:27:00 AM |
Annual |
Ordered Repaired |
- Upholstery or padding is ripped, torn, or improperly repaired.
|
Chris Kath |
|