LAKE CENTRAL SCHOOL CORP.
To view the full report for a bus inspection, click on the PDF icon on the right.

Go Back New Search

Bus Inspections

Bus # Inspection Date/Time Inspection Valid Until Inspection Type Inspection Status Violations Inspected By Reports
36 3/27/2024 11:21:01 AM 9/30/2025 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
36 7/25/2023 9:19:01 AM 9/30/2024 12:00:00 AM Re-Inspection Approved None Nathan Sherer Export Inspection Report
36 7/25/2023 8:40:00 AM 8/23/2023 8:40:00 AM Annual Ordered Repaired
  • Step-well light is missing or inoperative
Nathan Sherer Export Inspection Report
36 7/11/2022 8:18:01 AM 9/30/2023 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
36 7/20/2021 9:40:01 AM 9/30/2022 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
36 7/29/2020 9:31:01 AM 9/30/2021 12:00:00 AM Re-Inspection Approved None Nathan Sherer Export Inspection Report
36 7/29/2020 9:23:00 AM 8/27/2020 9:23:00 AM Annual Ordered Repaired
  • The first aid kit is not complete: One (1) package adhesive bandages; containing a total of sixteen (16) 1" x 3" bandages, 1 roll 1”x5yd, 1 blunt scissor, 6 3x3” gauze pads (sterile), 4 2”x5yd gauze stretch material (nonsterile), 3 oval eye pads (sterile), 2 triangular bandages, 1 instruction.
Nathan Sherer Export Inspection Report
36 3/26/2019 9:42:01 AM 9/30/2020 12:00:00 AM Re-Inspection Approved None Nathan Sherer Export Inspection Report
36 3/26/2019 8:04:00 AM Annual Out of Service
  • There is no brake certification form the certification is expired or is not signed within the six-month requirement
Nathan Sherer Export Inspection Report
36 3/28/2018 8:05:01 AM 9/30/2019 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
36 3/28/2017 7:46:01 AM 9/30/2018 12:00:00 AM Annual Approved None Tim Grayson Export Inspection Report
Go Back New Search