SUNMAN-DEARBORN COMM. SCH CORP
To view the full report for a bus inspection, click on the PDF icon on the right.

Go Back New Search

Bus Inspections

Bus # Inspection Date/Time Inspection Valid Until Inspection Type Inspection Status Violations Inspected By Reports
14 2/7/2024 9:37:01 AM 9/30/2025 12:00:00 AM Re-Inspection Approved None Chris Clark Export Inspection Report
14 2/7/2024 9:27:00 AM 3/7/2024 9:27:00 AM Annual Ordered Repaired
  • Any clearance light is missing, cracked, faded, wrong color, or inoperative
Chris Clark Export Inspection Report
14 3/8/2023 11:59:01 AM 10/8/2023 11:59:01 AM Re-Inspection Approved None Chris Clark Export Inspection Report
14 2/9/2023 8:26:00 AM 3/10/2023 8:26:00 AM Annual Ordered Repaired
  • Upholstery or padding is ripped, torn, or improperly repaired
  • Battery compartment floor is weakened from rust
Chris Clark Export Inspection Report
14 8/16/2022 8:22:01 AM 3/16/2023 8:22:01 AM Semi-Annual Approved None Chris Clark Export Inspection Report
14 2/8/2022 10:28:01 AM 9/8/2022 10:28:01 AM Annual Approved None Chris Clark Export Inspection Report
14 9/15/2021 11:52:01 AM 4/15/2022 11:52:01 AM Re-Inspection Approved None Chris Clark Export Inspection Report
14 8/31/2021 9:17:00 AM 9/29/2021 9:17:00 AM Re-Inspection Ordered Repaired
  • Switch not self-canceling
Chris Clark Export Inspection Report
14 3/10/2021 10:13:01 AM 10/10/2021 10:13:01 AM Re-Inspection Approved None Chris Clark Export Inspection Report
14 2/22/2021 10:22:00 AM 3/23/2021 10:22:00 AM Annual Ordered Repaired
  • Any required instrument or gauge is inoperative. (Speedometer, Odometer, Fuel Gauge, High beam, Brake indicator light or gauge, air pressure gauge, brake warning light, DEF Gauge)
Chris Clark Export Inspection Report
14 10/20/2020 9:03:01 AM 5/20/2021 9:03:01 AM Semi-Annual Approved None Chris Clark Export Inspection Report
14 9/30/2020 1:52:01 PM 4/30/2021 1:52:01 PM Registration Approved None Chris Clark Export Inspection Report
14 9/28/2020 9:09:01 AM 4/28/2021 9:09:01 AM Registration Approved None Chris Clark Export Inspection Report
14 9/16/2020 8:14:01 AM 4/16/2021 8:14:01 AM Re-Inspection Approved None Chris Clark Export Inspection Report
14 6/29/2020 5:11:00 PM Annual Out of Service
  • Air leak at proper connection
  • A dripping oil or fluid leak
  • There is no brake/king pin certification form, the certification is expired or is not signed within the six-month requirement
  • See Notes: Any defect inspector deems a violation not listed
Dan Elmore Export Inspection Report
14 6/29/2020 4:55:01 PM 1/29/2021 4:55:01 PM Re-Inspection Approved None Dan Elmore Export Inspection Report
14 3/6/2020 2:15:00 PM Spot Checks Out of Service
  • Insulation is missing from any wire
  • There are loose, broken or frayed wires
  • Kingpin movement measured at bottom of tire is greater than wheel size/movement - 16"/1/4", 17"-18"/3/8", over 18"/1/2"
  • The engine has excessive oil or grime build-up, or if there is dirt or fluid standing on the engine (i.e. oil, coolant, etc.)
Dan Elmore Export Inspection Report
14 2/12/2020 10:33:01 AM 9/12/2020 10:33:01 AM Annual Approved None Dan Elmore Export Inspection Report
14 9/13/2019 8:42:01 AM 4/13/2020 8:42:01 AM Semi-Annual Approved None Chris Clark Export Inspection Report
14 2/13/2019 10:14:01 AM 9/13/2019 10:14:01 AM Annual Approved None Chris Clark Export Inspection Report
14 9/13/2018 9:23:01 AM 4/13/2019 9:23:01 AM Semi-Annual Approved None Chris Clark Export Inspection Report
14 1/30/2018 10:29:01 AM 8/30/2018 10:29:01 AM Annual Approved None Chris Clark Export Inspection Report
14 9/11/2017 9:18:01 AM 4/11/2018 9:18:01 AM Semi-Annual Approved None Chris Clark Export Inspection Report
14 2/8/2017 10:13:01 AM 9/30/2018 12:00:00 AM Annual Approved None Chris Clark Export Inspection Report
14 2/17/2016 9:25:01 AM 9/30/2017 12:00:00 AM Annual Approved None Chris Clark Export Inspection Report
14 6/26/2015 10:29:01 AM 9/30/2016 12:00:00 AM Registration Approved None Chris Clark Export Inspection Report
Go Back New Search