MY SCHOOL CHILDCARE & LRNG CTR
To view the full report for a bus inspection, click on the PDF icon on the right.

Go Back New Search

Bus Inspections

Bus # Inspection Date/Time Inspection Valid Until Inspection Type Inspection Status Violations Inspected By Reports
01 7/16/2024 11:24:01 AM 9/30/2025 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
01 7/7/2023 8:20:01 AM 9/30/2024 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
01 7/13/2022 12:10:01 PM 9/30/2023 12:00:00 AM Re-Inspection Approved None Nathan Sherer Export Inspection Report
01 7/8/2022 9:43:00 AM Annual Out of Service
  • There is no brake certification, or the certification has expired or is not signed
Tim Grayson Export Inspection Report
01 12/7/2021 8:41:01 AM 9/30/2022 12:00:00 AM Spot Checks Approved None Nathan Sherer Export Inspection Report
01 8/2/2021 10:16:01 AM 9/30/2022 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
01 12/7/2020 10:16:01 AM 9/30/2021 12:00:00 AM Spot Checks Approved None Tim Grayson Export Inspection Report
01 7/15/2020 11:12:01 AM 9/30/2021 12:00:00 AM Re-Inspection Approved None Nathan Sherer Export Inspection Report
01 7/10/2020 10:54:00 AM Annual Out of Service
  • There is no brake certification, or the certification has expired or is not signed
Nathan Sherer Export Inspection Report
01 12/11/2019 10:19:01 AM 9/30/2020 12:00:00 AM Spot Checks Approved None Nathan Sherer Export Inspection Report
01 7/12/2019 10:23:01 AM 9/30/2020 12:00:00 AM Annual Approved None Tim Grayson Export Inspection Report
01 12/5/2018 8:38:01 AM 9/30/2019 12:00:00 AM Spot Checks Approved None Tim Grayson Export Inspection Report
01 7/20/2018 10:27:01 AM 9/30/2019 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
01 1/8/2018 7:05:01 AM 9/30/2019 12:00:00 AM Re-Inspection Approved None Nathan Sherer Export Inspection Report
01 12/13/2017 11:06:00 AM Spot Checks Out of Service
  • Any rear turn signal does not function properly
Nathan Sherer Export Inspection Report
01 7/11/2017 9:25:01 AM 9/30/2018 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
01 10/12/2016 10:39:01 AM 9/30/2017 12:00:00 AM Registration Approved None Nathan Sherer Export Inspection Report
01 9/13/2016 8:00:00 AM 10/12/2016 8:00:00 AM Registration Ordered Repaired
  • Any required lettering is missing or faded
  • Prohibited area line is missing or improper
  • Prohibited area sign is missing or obscured
  • The seat belt cutter is not secured
  • Does not have four combination red brake lamps, two with minimum 38 sq inch illuminated (7" round) and two with a minimum of 12 sq inches illuminated area(4" round), mounted on the rear of the body between the belt line and floor line
  • The first aid or bodily fluid (optional) kit is not securely mounted, inside, in a location accessible to the driver in plain view, or if in a bulkhead or storage compartment, is not secured, or the cover of the bulkhead/storage compartment is not clearly labeled "Emergency Equipment."
  • The first aid kit is not complete: 3 packs of 16 1x3 adhesive strips, 1 scissor (4" min), 2 40"x40"x56" triangular bandages, 6 3"x3" gauze pads, 4 2"x4.1 yard rolls of gauze, 3 oval eye pads, 1 1"x5 yard of adhesive tape, 1 label instruction.
Nathan Sherer Export Inspection Report
Go Back New Search