Reevaluation Documents
- Section 4 – Segment 2 Reevaluation 1.37mb
- Section 4 – Segment 6A Reevaluation 1.27mb
- Section 4 – Segment 7 Reevaluation 4.73mb
- Section 4 – Segment 8 Reevaluation 5.37mb
- Section 4 – Segment 9 Reevaluation 19.69mb
Record of Decision
- Chapters 7.8mb
- Appendix A 166kb
- Appendix B 1.5mb
- Appendix C 4.79mb
- Appendix D 52kb
- Appendix E 70kb
- Appendix F 10.35mb
Final Environmental Impact Statement
FEIS (95.2 MB)
- Chapter-01 Background
- Chapter-02 Purpose and Need
- Chapter-03 Alternatives
- Chapter-04 Affected Environment
- Chapter-05 Environmental Consequences
- Chapter-06 Comparison of Alternatives
- Chapter-07 Mitigation and Commitments
- Chapter-08 Section 4(f)
- Chapter-09 List of Preparers
- Chapter-10 Distribution of EIS
- Chapter-11 Comments, Coordination and Public Involvement
- Chapter-12 References
- Chapter-13 Glossary, Acronyms, and Index
- Chapter-Summary
- TOC
- Appendix A Business Needs Survey (3.83 MB)
- Appendix B Traffic Modeling Technical Report and FHWA Review (2.18 MB)
- Appendix C Agency Coordination Correspondence
- Formal Correspondence Directory (Excel File) (156 KB)
- 2004 Correspondence (ZIP File) (8.52 MB)
- 2005 Correspondence (ZIP File) (11.4 MB)
- 2006 Correspondence (ZIP File) (46.9 MB)
- 2007 Correspondence (ZIP File) (23.6 MB)
- 2008 Correspondence (ZIP File) (2.37 MB)
- 2009 Correspondence (ZIP File) (46 MB)
- 2010 Correspondence (ZIP File) (6.97 MB)
- 2011 Correspondence (ZIP File) (3.44 MB)
- Appendix D Cost Estimation Methodology (300 KB)
- Appendix E Expert Land Use Panel Meeting Notes (108 KB)
- Appendix F Final Wetland Technical Report (18.9 MB)
- Appendix G Survey of Churches (1.79 MB)
- Appendix H Hazardous Materials Report (12.7 MB)
- Appendix I Survey of Schools (749 KB)
- Appendix J Air Quality Technical Report (9.55 KB)
- Appendix K NRCS Forms (3.94 MB)
- Appendix L USDOT Air Quality Guidance (80 KB)
- Appendix M Final Stream Assessment Report (110 MB)
- Appendix N Section 106 Documentation (ZIP File) (134 MB)
- Appendix O Indiana Bat Surveys (21.4 MB)
- Appendix P Correspondence – Government Other Than Resource Agencies (10.5 MB)
- Appendix Q INDOT SOP’s – Wells, Asbestos, Snow & Ice Control (538 KB)
- Appendix R Refined Preferred Alternative Plan & Profile Drawings (26.39 MB)
- Appendix S Revised Tier 1 Conceptual Forest & Wetland Mitigation Plan & Comparison of Tier 1 Plans (6.11 MB)
- Appendix T I-69 Planning Grant Program Update (16 KB)
- Appendix U INDOT Long Range Plan Update Sensitivity Analysis (329 KB)
- Appendix V Median Width & Safety (159 KB)
- Appendix W Wetlands Memorandum of Understanding (825 KB)
- Appendix X Final Noise Technical Report (511 KB)
- Appendix A – Figures 1-3 (40.8 MB)
- Appendix A – Figure 4 (26.3 MB)
- Appendix A – Figures 5-7 (23.6 MB)
- Appendix A – Figure 8 (14.3 MB)
- Appendices B-P (13.6 MB)
- Appendix Q – Refined Preferred Alternative 2, Highway Noise Impact & Abatement Analysis Report (380 KB)
- Appendix A – Figure 1 (48.4 MB)
- Appendix A – Figure 2 (31.7 MB)
- Appendices B-F (4.55 MB)
- Appendix G – Noise Wall Survey (5.7 MB)
- Appendix Y Bald Eagle Permits (532 KB)
- Appendix Z Documentation of Local Access Decisions(ZIP File) (26.7 MB)
- Appendix AA Final Karst Report Addendum to Karst Report (Redacted) (20.1 MB)
- Appendix BB Emergency Responder Coordination (5.23 MB)
- Appendix CC Indirect Impact Analysis (664 KB)
- Appendix DD Revised Tier 1 BO (4.06 MB)
- Appendix EE CAC & Public Information Meeting Summaries (541 KB)
- Appendix FF Post-Screening Analysis in Subsection 4G (54 KB)
- Appendix GG Low-Cost Design Memorandum (3.0 MB)
- Appendix HH Karst Features in the Southwest Indiana Highway Corridor (Redacted) (17.9 MB)
- Appendix II Noise Contour Mapping (12.0 MB)
- Appendix JJ1 Redacted Section 4 Tier 2 Biological Assessment (37.9 MB)
- Appendix JJ2 Redacted I-69 Section 4 Tier 2 Biological Opinion (2.18 MB)
- Appendix KK Tier 1 – Tier 2 Impact Comparison (100 KB)
- Appendix LL Year of Expenditure Costs (40 KB)
- Appendix MM Greene County Air Conformity (1.82 MB)
- Appendix NN Not Used
- Appendix OO SR 45 Operational & Safety Analysis (819 KB)
- Appendix PP Interim SR 37 Interchange Design (6.61 MB)
- Appendix QQ SR 37 Operational and Safety Analysis (565 KB)
Volume III – Comments & Responses
- Introduction & Part A – Comments & Responses (4.85 MB) *This file was revised on July 28, 2011
- Part 2 – Written Comments & Public Hearing Transcriptions (12.5 MB)
- Part 3 – Pre-Tier 2 Comments
- File 1A (47.9 MB)
- File 9 (131 KB)
- File 10 (80 MB)
- File 11 (83 MB)
- File 12 (67.1 MB)
- File 13 (52.1 MB)
- File 14A (63 MB)
- File 14B (60.2 MB)
- File 15 (87.7 MB)
- File 16A (69.4 MB)
- File 16B (83 MB)
- File 16C (61.9 MB)
- File 17A (61 MB)
- File 17B (86 MB)
- File 17C (70.4 MB)
- File 17D (63.1 MB)
- File 17E (72.7 MB)
- File 18A (49.4 MB)
- File 18B (49.1 MB)
- File 18C (12.9 MB)
- File 19A (43.5 MB)
- File 19B (44.3 MB)
Clean Water Act Permits