Language Translation
  Close Menu

The Ford Road bridge over I-865 will be replaced, beginning spring 2026. The project will replace a four-span, multi-girder bridge first constructed in 1964 and rehabilitated in 1981. The contractor, Rieth-Riley Construction Company Inc., will replace this structure with a two-span, continuous, pre-stressed concrete, bulb-tee bridge. The proposed bridge will support two 12-foot travel lanes with two 6-foot 4-inch shoulder and a 10-foot-wide multi-use path. The project is located in Boone County near Zionsville. The projected is expected to be complete in late fall 2026.

Ford Road Bridge Detour MapFord Road Project Location Map