ILLINOIS CENTRAL SCHOOL BUS
To view the full report for a bus inspection, click on the PDF icon on the right.

Go Back New Search

Bus Inspections

Bus # Inspection Date/Time Inspection Valid Until Inspection Type Inspection Status Violations Inspected By Reports
575 8/16/2016 9:28:01 AM 9/30/2017 12:00:00 AM Annual Approved None Dale Morgan Export Inspection Report
575 7/21/2015 10:33:01 AM 9/30/2016 12:00:00 AM Annual Approved None Nathan Sherer Export Inspection Report
575 7/22/2014 7:58:01 AM 9/30/2015 12:00:00 AM Re-Inspection Approved None Nathan Sherer Export Inspection Report
575 7/14/2014 11:15:00 AM Annual Out of Service
  • The audible warning device fails to operate.
  • There are loose, broken, or missing mountings
Dale Morgan Export Inspection Report
575 12/11/2013 8:39:01 AM 9/30/2014 12:00:00 AM Post-Crash Inspection Approved None Nathan Sherer Export Inspection Report
575 12/3/2013 11:25:00 AM Post-Crash Inspection Out of Service
  • Clearance light is missing, cracked, faded, wrong color, or inoperative.
  • Mountings are broken or bent badly enough to inhibit proper adjustment.
  • An exhaust leak can be felt with the bare hand six (6) inches from the leak in any direction (with the engine idling and the system unrestricted).
  • The first aid kit is not properly filled.
  • There is no brake certification, the certification has expired, or is not signed within the six month requirement.
  • Upholstery or padding is ripped, torn, or improperly repaired.
  • Seat back or bottom is loose.
  • If equipped, the emergency warning buzzer does not sound.
Nathan Sherer Export Inspection Report
575 7/19/2013 8:52:01 AM 9/30/2014 12:00:00 AM Re-Inspection Approved None Nathan Sherer Export Inspection Report
575 7/18/2013 9:33:00 AM 8/16/2013 9:33:00 AM Annual Ordered Repaired
  • Taillights are not the same on both sides (either LED or standard)
  • One (1) taillight or one (1) brake light does not function
  • Step-well light is missing or inoperative
  • Dome light is inoperative.
  • The mirrors do not meet the outside mirror standard as set forth in 575 IAC 1-2-49.
David Eggers Export Inspection Report
575 6/4/2012 1:04:00 PM 9/30/2013 12:00:00 AM Re-Inspection Approved None David Eggers Export Inspection Report
575 6/4/2012 12:40:00 PM 7/3/2012 12:40:00 PM Re-Inspection Ordered Repaired
  • The first aid kit is not properly filled in accordance with the '24 Unit Kit'.
  • Any required padding is missing
David Eggers Export Inspection Report
575 6/1/2012 11:32:00 AM 6/30/2012 11:32:00 AM Re-Inspection Ordered Repaired
  • The parking brake cannot be adjusted to function properly.
  • The parking brake fails to hold the bus during the testing procedure.
David Eggers Export Inspection Report
575 6/1/2012 11:30:00 AM 9/30/2013 12:00:00 AM Re-Inspection Approved None David Eggers Export Inspection Report
575 6/1/2012 11:30:00 AM 6/30/2012 11:30:00 AM Re-Inspection Ordered Repaired
  • Any required padding is missing
  • The first aid kit is not properly filled in accordance with the '24 Unit Kit'.
David Eggers Export Inspection Report
575 6/1/2012 11:28:00 AM 6/30/2012 11:28:00 AM Annual Ordered Repaired
  • Any required padding is missing
  • The first aid kit is not properly filled in accordance with the '24 Unit Kit'.
David Eggers Export Inspection Report
Go Back New Search